Page 12 - Fall 2020 issue
P. 12
HERE’S A SNAPSHOT OF ALL THE REMODEL PROJECTS DONE IN THIS HOME: 1. KITCHEN – completely re-done • Wall demo • Design changes • Relocate plumbing and electrical • All new cabinets, countertops, fixtures and flooring 2. LIVING ROOM • New flooring, paint and fixtures 3. 1ST FLOOR BATHROOM • New cabinets, countertop, shower tile and glass, flooring and all fixtures 4. 2ND FLOOR HALL BATHROOM • New cabinets, countertop, shower tile and glass, flooring and all fixtures 5. MASTER BATHROOM • Redesign • New flooring, cabinets, countertops, shower tile and glass and all fixtures 6. PAINTING • New paint color on all living area walls and trim 7. WINDOWS • Replaced 15 damaged rotten wood windows Before the magic of a remodel be- gins, the place must be fully prepped and ready to take on the coming weeks/months of intense labor. Two men spent over two days in prep-work alone for this project. We put up plastic walls to block off the master bedroom, and carboard flooring over everything, including the stairs to protect the parts that were not being remod- eled. We also used BuildClean air cleaner to keep the house dust-free. Our clients can rest easy knowing their home will be taken care of as much as possible during a remodel.