Page 1 - Operating
P. 1
OPERATING
A. COMMISSIONING OF DOUBLING AND YARD ARRANGEMENTS FOR NEW LINES
1. Shadnagar – Gollapalli (30 kms) :Doubling commissioned on 16.09.2020.
2. Cavalry Barracks: Yard remodeling in connection with Track machine satellite depot
was done and commissioned on 10.02.2021
3. Jaklair – Makthal (11.47 km) : New line between Jaklair and Makthal commissioned
on 05.06.2020.
4. Manoharabad- Gajwel (31.07 km): New line between Manoharabad and Gajwel
commissioned on18.06.2020 .
B. COACHING
i. PUNCTUALITY:
The punctuality performance of Express trains from April-20 to Feb-21 is 95.5%.
ii. SPECIAL TRAINS:
786 Special Trains are originated from KCG/NZB/KRNT and Rs. 45.93 Crs earnings,
as against 334 Special Trains and Rs. 18.85 Crs earnings of last year (Apr-20 to
Feb-21) which is more by 143.6 %.
III. SHRAMIK SPECIAL TRAINS:
During the pandemic Covid-19, 23 Shramik special trains originated from KCG,
MBNR, KRNT, MED, BMO to various northern states of India.
iv. TRAFFIC BLOCKS
During the period from April-2020 to Feb-2021, 13782 hours of traffic Blocks were
offered as against 9469 hours of last year for Maintenance/ TWR/ elimination of LC
gates and Machine works, which is more by 45.5% against last year.
C. FREIGHT
i. LOADING:
During the financial year (upto Feb-2021), the division has loaded 1.329 Million Tonnes
(719.5 rakes) as against 0.966 Million Tonnes(515 rakes) done in 2019-20, which is
more by 37.7%.
Revenue Loading: During 2020-21, the division has achieved Revenue loading of
1.199 MTs as against the revenue loading of 0.882 MTs done in 2019-20 and as
against the target of 1.199 MTs, which is more by 36% over last year.
Food Grains:Food Grains loading achieved in 2020-21 is 0.999 MTs(376.5 rakes) as
against 0.624 MTs (228 rakes) in 2019-20 and as against the annual target of 1.090
MTs which is more by 60.2% over last year.
84