Page 1 - AH.signal and telecom
P. 1

SIGNALLING & TELECOMMUNICATION


                                                  SIGNALLING


               1.  Interlocking of Manned LC:

                   a.  Carried out interlocking of existing engineering manned LC gate no 189A between
                       NVT-JKM  section.  Provided  mini  IPS  in  new  service  building,  Solar  panels,
                       Electrically  operated  lifting  barrier  of  S&T  Workshop/MFT,  Emergency  sliding
                       boom and Approach warning arrangement.

                   b.  Carried  out  interlocking  of  existing  engineering  manned  LC  No.  12  between
                       BDVL-UR is interlocked and provided with EOLB of M/s Global and emergency
                       sliding boom.














               2.   Replacement of MOLB to EOLB:

                    Existing  05  Mechanically  Operated  Lifting  barrier  (MOLB)at  interlocked  LC  gates
                    replaced with Electrically Operated Lifting barrier (EOLB) at LC155, LC189A, LC12,
                    LC104  &  LC138.  28  Nos  LC  gates  out  of  total  interlocked  79  LC  gates  have
                    been completed.















               3.   Emergency standby Sliding Boom Barriers:

                    Provided emergency stand by Sliding Boom Barriers at 04 interlocked LC gates no.
                    142, 147, 189A & 12. 69 interlocked LC gates have been provided with sliding
                    booms out of total 79 interlocked LC gates in the division.












                                                                                                   Page 1 of 8
   1   2   3   4   5   6