Page 1 - AH. operating
P. 1

OPERATING



            A.  COMMISSIONING OF DOUBLING AND YARD ARRANGEMENTS FOR NEW LINES

                   Umdanagar –Shadnagar (29.76 km)              :  Doubling commissioned on 21.07.2021

                   Falaknuma - Umdanagar (13.98 km)             :  Doubling commissioned on 26.03.2021

                   Cavalry Barracks yard                        :  Yard  remodeling  in  connection  with
                                                                    Track machine satellite depot was done
                                                                    and commissioned on 10.02.2021.

                   Shadnagar – Gollapalli (30.23kms)            :  Doubling commissioned on 16.09.2020.

                   Manoharabad- Gajwel (31.07 km)               :  New  line  between  Manoharabad  and
                                                                    Gajwel commissioned on 18.06.2020.

                   Jaklair – Makthal (11.47 km)                 :  New  line  between  Jaklair  and  Makthal
                                                                    commissioned on 05.06.2020.

            B.  COACHING

                a)  PUNCTUALITY:
                    The  punctuality  performance  of  Express  Group  trains  from  April-21  to  Sep-21  is
                    95.97%.

                b) TRAFFIC BLOCKS:
                    7457  hours  of  traffic  Blocks  were  offered  in  2021-22  (Upto  Sep)  as  against  7029
                    hours of last year (Upto Sep) for Maintenance/ TWR/ elimination of LC gates and
                    Machine works, which is more by 6% against last year.

                c) KISAN TRAINS:
                   22  Kisan  trains  loaded  with  “Onion”  commodity  are  originated  from  KCG/KRNT,
                                                                      st
                   which earned an amount of Rs. 358.96 lakhs. 1  Kisan train ran from KCG to GHY
                   on 23.08.2021.


            C.  FREIGHT

                i. LOADING:

                 During the financial year (upto Sep-2021), the division has achieved 0.752MT (413.5
                 rakes) as against the loading of 0.783MT (407.5 rakes) done in 2020-21 and as against
                 proportionate target of 0.669 MT, which is more by 12.4% over target.

                 Revenue Loading: During 2021-22 (upto Sep-21), the division has achieved Revenue
                 loading of 0.686 MTs as against the revenue loading of 0.706 MTs done in 2020-21
                 and  as  against  proportionate  the  target  of  0.669  MTs,  which  is  more  by  2.6%  over
                 target.