Page 1 - PH-1600
P. 1
Exp. Exp. %age
PROJECT PB Item Last upto during Anticipate Phy.
SN PH Y-o-S (PB,LB,D Short Name of Work Alloc. Sanc d TDC of REMARKS Status
ID RM) Cost March 2020- Rly portion progres
'20 2021 s of Rly
11.03.16.17. 16 2017- PB-76 Hyderabad Division - New crossing stations (4 Cap. 382600 27240 3216 31/03/2023 16 Work in Progress for Bridge & Earth Work. Land Acquisition for WIP
1.52.001 2018 Nos) Station Building Under Process by State Govt. of Telangana (3
Stations) & Andhra Pradesh (01 Station).
1 Exemption received for 01 Station (Perur) between WPR-KQQ. At
present only one station is planned between WPR-KQQ (Perur
station) and remaining 03 stations will be taken along with
doubling. TDC 31/03/2023
11.03.16.14. 16 2014- LB-18 Kachiguda - Provision of additional Stabling line DF(3) 9942 0 1258 31/07/2021 40 Work in progress. Track linking completed. Track Will be PHC
6.52.001 2015 Connected along with KCG Yard Modification for IOH Shed.
2 Revised SIP under process for pproval to Shifting shunt permit
indicator in connection with IOH Shed. TDC 31/07/2021.
11.03.16.18. 16 2018- LB-12 Nizamabad- Remodelling of yard arrangements Cap. 87984 1400 3493 31/08/2022 10 CRS sanction obtained, Agencies Available, Work not started due WIP
3.52.001 2019 for providing additional platforms and one full to involvement of shifting of Goods shed to JKM station. Proposal
3 length dead end spur. for shifting of Goods Shed to JKM and development of goods
shed circulating area at JKM is pending for sanction at Railway
Board. TDC 31/08/2022
11.03.16.19. 16 2019- LB-14 Sivangoan (NZB-MUE section): Provision of DF(3) 2553 0 1969 31/07/2021 30 Work in progress. TDC-31.07.2021 PHC
4 3.52.001 2020 Shunt Signals