Page 1 - PH6500
P. 1

Exp.   Exp.           %age
             PROJECT           PB Item                                         Last   upto   during   Anticipate  Phy.
        SN            PH Y-o-S (PB,LB,D       Short Name of Work        Alloc.  Sanc              d TDC of                          REMARKS                     Status
                ID              RM)                                            Cost  March   2020-  Rly portion  progres
                                                                                       '20  2021           s of Rly
            11.03.65.19.  65  2019-  -  Hyderabad Division -TA camp Moula-ali-  RRSK  7909  0  4916  31/12/2021 8  Work in progress. Funds to the tune of 80 lakhs are required for   WIP
         1  4.52.001       2020      Construction of toilet block and drainage                                   for the current financial year. TDC 31/12/2021
                                     arrangements at JCO's accommodation.
            11.03.65.19.  65  2019-  -  RPF/TC/Moula-Ali- Proposed Construction of   Cap.  9917  0  0  31/12/2021 5  Civil: Work In Progress. Elec-Tender opened under process.   WIP
         2  4.52.002       2020      Inspectors accommodation above JCO's Mess.                                  Funds to the tune of 65 lakhs are required for for the current
                                                                                                                 financial year. TDC 31/12/2021
            11.03.65.16.  65  2016- PB-762 Hyderabad (IRISET) - Augmentation of training   DF(3),R 47289  31924  4335  31/03/2021 70  1) Ansaldo EI installed                   
  PHC
         3  1.52.001       2017      facilities                        RSK                                       2) Siemens Westrace commissioned.
                                                                                                                 3) Siemens RRI work in progress TDC 31/03/2021
            11.03.65.17.  65  2017- PB-764 Hyderabad (IRISET) - Upgradation of basic   RRSK  38800  7343  0  31/12/2021 30  1) Hostel 3 'A&B' block renovation completed
  WIP
            1.52.002       2018      amenities to supervisors hostel-1 & hostel-3 B-                             2) Hostel 1 renovation in progress.
         4
                                     block                                                                       3) S&T portion items procured
                                                                                                                 TDC 31/12/2021
            11.03.65.16.  65  2016-  LB-  Hyderabad division - Proposed construction of   DF(3)  9760  809  526  30/09/2021 35  Work In Progress. Casting of Slabs has been completed. Funds of  WIP
         5  6.52.001       2017  1150 hostel block for male trainees in lieu of shifting of                      84 Lakhs are required for completion of works. TDC 30/09/2021
                                     ZCETI from Kacheguda to North Lallaguda.
            11.03.65.19.  65  2019-  LB-  HYB Div: TA Camp MLY -Jawans Mess   RRSK  13335  0  0  31/12/2021 8    LOA issued on 13.10.2020.  Foundation Work in progress. Funds  WIP
         6  6.52.001       2020  1161 Augmentation of Dining Hall of Capacity 200                                to the tune of 70 lakhs are required for for the current financial
                                     Inmates.                                                                    year. TDC 31/12/2021
            11.03.65.19.  65  2019-  LB-  HYB Div: TA Camp MLY -Augmentation of   RRSK  12401  0  0  31/12/2021 5  LOA issued on 13.10.2020.  Foundation Work in progress. Funds  WIP
         7  6.52.002       2020  1159 Jawans Shed of Size 30m x 10m and store                                    to the tune of 70 lakhs are required for for the current financial
                                     Hyb Div: Construction of Officers Suits 4 Nos for  RRSK
                                                                                                                 LOA issued on 13.10.2020.  Foundation Work in progress. Funds  WIP
            11.03.65.19.  65  2019-  LB-  rooms of size 10m x 6m.            12401   0     0     31/12/2021 8    year. TDC 31/12/2021
         8
            6.52.003       2020  1160 Gents and 1 No for Lady Officer at TA Camp,                                to the tune of 40 lakhs are required for for the current financial
                                     Moula Ali
                                                                                                                 LOA issued on 03.02.2021.Work in progress.TDC 31.12.2021.
            11.03.65.18.  65  2018- LB-1156 Procurement of audio visual equipment and   RRSK  3700  0  0  31/12/2021  year. TDC 31/12/2021                      WIP
         9  3.52.001       2019      other training accessories for personnel and
                                     other departmental training centers.
            11.03.65.18.  65  2018- LB-1151 IRISET -  Enhancement of SDH and PDH   RRSK  2422  1247  18  31/03/2021 90  Work in Progress -Balance 2 NS items to be procured  TDC   PHC
         10
            3.52.002       2019      experiment setup in Transmission Lab.                                       31/03/2021
            11.03.65.18.  65  2018- LB-1152 IRISET - Improvement to Hostel rooms, toilets   RRSK  4499  0  1000  31/03/2021 60  Work in progress- Mess renovation completed, Toilet renovation   PHC
         11  3.52.003      2019      and mess at Hostel No.2                                                     work in progress.  TDC 31/03/2021
            11.03.65.18.  65  2018- LB-1153 Hyderabad Div: Construction of One 45 Seat   RRSK  2251  0  1101  31/03/2021 85  Work in Progress. Revised Estimate Under Preparation towards   PHC
         12  3.52.007      2019      Class Room at RPF/TC/MLY                                                    Provision of Furniture. Civil work completed.  TDC 31/03/2021
            11.03.65.18.  65  2018- LB-1157 STTC-MLY - Development of class room for the  RRSK  2799  0  1447  31/03/2021 100  Work completed. Will be deleted by 31.03.2021. (Deletion Note   PHC
         13  3.52.008      2019      live capturing the class room lecture & events .                            Under Circulation)
            11.03.65.18.  65  2018- LB-1158 ZRTI/MLY-Re-Modelling of " Traffic Model   DF(3)  18400  0  0  31/12/2021 20  Work in progress. TDC-31.12.2021      WIP
         14  3.52.009      2019      Room".
            11.03.65.18.  65  2018- LB-1155 Construction of  4  class rooms, Lecture hall and  Cap.  15063  0  0  31/07/2021 5  Work in progress. TDC 31/07/2021  PHC
         15  3.52.010      2019      library at ZRTI/MLY for training of personnel
                                     branch staff.
            11.03.65.19.  65  2019- LB-1148 STTC/MLY ---Upgradation of E-Learning centre  DF(3)  3836  0  0  31/12/2022  LOA issued on 19.02.2021. Work in progress.TDC = 31.12.2022.  WIP
         16  3.52.001      2020
            11.03.65.19.  65  2019- LB-1149 STTC/ MLY- Digital Content (Core training   DF(3)  965  0  0  31/12/2022  LOA issued on 19.02.2021. Work in progress.TDC = 31.12.2022.  WIP
         17  3.52.002      2020      Modules / Videos) Display System
   1