Page 1 - GDPL
P. 1
STATION: GDPL KMS: 601.3 CLASS : NSG-6
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Department Staff Strength Type I II III IV Total
Total Actual Vac Available 8 - - - 8
OPTG 6 6 0
ENGG - - -
S&T 2 2 0
Total 8 8 0
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 25000 Station Building 1
i. Domestic (Lts) 16000 PWI office -
ii. Service Building (Lts) 7000 Relay Room 1
iii. Others (Lts) 2000 -
IV.PASSENGER AMENITIES
2 nd Class 25
1.Waiting Hall (in Sqm) 6. Taps 11
1 st Class -
PF. No. 1 192
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 4/1
PF. No. 2 -
PF. No. 1 340
3.Platform Length (in Meters) 8. Water Coolers -
PF. No. 2 -
4. Seats No's 68 9. Foot Over Bridge 1
5. Vending Stall No's - 10. ShaddyTrees 11
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 4
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.00197
2020-21 2021-22
VI. EARNINGS OF THE STATION 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
1. Passengers 1071835 0 0 35510
2. Parcels 0 0 0 0
3. Goods 0 0 0 0
VII. LOADING/UNLOADING
2020-21 2021-22
A.Loading -Outward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0
2020-21 2021-22
B. Unloading - Inward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0