Page 1 - JKM
P. 1
STATION: JKM KMS: 453.90 CLASS : NSG-6
I. STAFF STRENGTH II.(a).BUILDING-RESIDENTIAL
Department Staff Strength Type I II III IV Total
Total Actual Vac Available 13 2 - - 15
OPTG 6 5 1
Total 6 5 1
III. WATER SUPPLY ARRANGEMENTS II.(b).BUILDING- SERVICE
Total Demand (Lts) 15000 Station Building 1
i. Domestic (Lts) 12000 PWI office -
ii. Service Building (Lts) 3000 Relay Room 1
IV.PASSENGER AMENITIES
2 nd Class 34
1.Waiting Hall (in Sqm) 6. Taps 11
1 st Class -
PF. No. 1 178
2.Platform Shelter(in Sqm) 7.Lavatories/Urinals 2/1
PF. No. 2 -
PF. No. 1 350
3.Platform Length (in Meters) 8. Water Coolers -
PF. No. 2 -
4. Seats No's 62 9. Foot Over Bridge -
5. Vending Stall No's - 10. ShaddyTrees 15
V.PASSENGER DETAILS
i. Number of Passengers dealt per day (Nos.) 0
ii. Average Earnings of the station per day (Rs. In Lakhs) 0.00000
2020-21 2021-22
VI. EARNINGS OF THE STATION 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
1. Passengers 501160 0 0 0
2. Parcels 0 0 0 0
3. Goods 0 0 0 0
VII. LOADING/UNLOADING
2020-21 2021-22
A.Loading -Outward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0
2020-21 2021-22
B. Unloading - Inward 2019-20 2020-21
(Upto Sept'20) (Upto Sept'21)
No.Of Wagons 0 0 0 0
Tonnage 0 0 0 0
Commodity 0 0 0 0