   Summary of Capital and Facility Projects:
ECCS Three-Year Education Plan and Annual Education Results Report
Planning For The Future
Progress
The latest CKCS modernization project was financed from surplus funds which supported the following upgrades:
•New science lab and sensory room.
•Minor modernization to structural elements to repair cracking on exterior slab.
•Repair visible cracks on exterior walls, repair mechanical elements on the roof. •Replace tiles in male washroom, repair bathroom floor seams.
•Replace heating water boilers, pumps, expansion tank.
•Replace flush valve urinals in boy’s washroom.
•Replace heat exchanges on air handling units.
•Replace electronic controls system.
•Replace air handling units with complete supply air and return air duct distributions to meet ASHRAE ventilation standards.
•Repair roof top unit serving music room.
•Correct heating issues in music and art supply room.
•Install fire dampers in all duct penetrations through fire rated walls and openings for code purposes.
•Replace circuit panel boards that are obsolete.
•Replacement of T12 lamps.
•Replace heat detectors in gymnasium seating area with smoke detectors.
•Convert rooms 124-177 back to instructional space.
•Provide CTS space.
•Resolve drainage issues at southwest corner of the school.
•Convert mezzanine level above gymnasium to usable space.
•Painting the interior of the school.
•Purchased of classroom furniture.
•Purchased and installed SMART LCD panels.
Estimated Cost - $ 2,324,000.00