Page 1 - COMPREHENSIVE_SITE_ASSESSMENT_REPORT_IMAGES_FOR_VOLUME_03
P. 1

HEAD OFFICE                     |VAT REGISTRATION NUMBER          |4960317727  FLEET & EQUIPMENT
                                       PHYSICAL ADDRESS:Ground Floor – Building 2   |NHBRC REGISTRATION NUMBER   |4000013824                                                                               IN-HOUSE EARTHMOVING FLEET UNITS)  INSURANCE
                                                                       |CIDB GRADING DESIGNATION   |   GNSS RTK SURVEY EQUIPMENT  PUBLIC LIABILITY COVER| R5 MILLION
                                       Gleneagles Park 10Flanders Drive Mount Edgecombe  |CSD SUPPLIER NUMBER               |  SCAFFOLDING & FORMWORK SYSTEMS  PROFESSIONAL INDEMNITY| R2MILLION
                                           POSTAL ADDRESS: P.O. Box 582 Westville 3630  TAX CLEARANCE CERTIFICATE    |SARS COMPLIANT    HUMAN RESOURCES   ALL RISK COVER        | R10 MILLION
                                                                       |B-BBEE LEVEL                 |LEVEL 1   BARGAINING COUNCIL REGISTRATION|BCAWU COMPLIANT                      BANK DETAILS
                                           TEL: +27 73 557 1040        Fax:
                                                                       CSD SUPPLIER NUMBER          |REGISTERED  PERMANENT CREW |TRAINED ARTISANS PERSONNEL  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT
                                       EMAIL: admin@dsonindustries.co.za  MASTER BUILDERS ASSOCIATION  |MEMBER  QUALIFIED SITE SAFETY OFFICERS --2  |FIRST NATIONAL BANK — ACC NO: 63104084883, |
                                       WEBSITE: www.dsonindustries.co.za  CIVIL ENGINEERING & CONSTRUCTION WORKS  INHOUSE ENGINEERS AND DRAUGHTSMAN  BRANCH WESTVILLE (250655), SWIFT: FIRNZAJJ |
                                                                                                   FULL SAFETY COMPLIANCE (ISO 45001/OHS ACT)  ACCOUNT TYPE  | BUSINESS CHEQUE ACCOUNT

                                                                                     2
                                                  2
                 Note:  Standard rate RI 75.00/m I  Demonstration rate: R85.00/m represents potential savings ofR540,000.00




                                                                       2
                 6.2 GS  DRYSTACK RETAINING WALL (147.4 m )

                 Proposed Scope Summary:


                 The G8  area retaining structure would incorporate:






                   • GNSS RTK alignment and foundation works


                   • Interlocking drystack concrete blocks (void-fill design)


                   • Geotextile and drainage installation


                   • Engineered backfill with mechanical compaction


                   • Structural verification and as-built documentation





                 Specifications:



                  Parameter                               Specification                                                Unit Rate


                  Wall Length                             134 linear meters                                            Rl,250.00/m  2

                  Wall Height                             1,100mm                                                      Included in rate


                                                                  2
                  Total Area Standards                    14 7.4 m face area                                           Included in rate
                  Compliance                              SANS  10400-K (Retaining Structures)                         Included in rate


                  Total Investment                        R184,250.00 + VAT


                                                                                                                                              ►






                 7.  FINANCIAL PROPOSAL: 2026 CAPEX CONSIDERATION


                 7.1  ITEMIZED COST SCHEDULE




                  Item       Description                                   Unit      Quantity        Rate (ZAR)          Amount (ZAR)

                  1          Road Rehabilitation (Full Scope)              m²        6,000           85.00               510,000.00

                  2          G8  Drystack Retaining Wall                   m²        147.4           1,250.00            184,250.00


                                                                                                                                              ►






                 7.2 FINANCIAL SUMMARY


                  Description Subtotal                                                                 Amount (ZAR)


                  (Items 1 & 2)                                                                        694,250.00

                  VAT@15%                                                                              104,137.50
   1   2   3   4   5   6