Page 8 - ELE1010
P. 8
1.3 STRAY VOLTAGE TESTING
Each individual cover shall be tested for voltage. In addition, the frame surrounding each cover shall also be tested. The tests shall be performed on bare metal areas. For locations with multiple covers, tests must be performed on each cover. Stray voltage tests shall be performed before removing the cover(s) and again after closing the cover(s).
If Stray Voltage is found, the surrounding area should be tested containing the energized area and made safe. Proper notifications should be made
immediately. Company Employees should take
action according to OJT ELE0020
7