Page 185 - xx10_BEGG_ALL_MASTER to Add to
P. 185

 Brief General Works Specifications_1
       Specifications & Recommendations For Street Front Door and Hallway Furniture
Entrance Front Door - interior and exterior wood surfaces
Entrance Hallway - ground floor
Strip back to original existing Light Oak and varnish/laquer/protect.
Remove (and replace) Residents Association Notice Board to alternative position and replace with large suitable Mirror (frame & size to still be determined). *
Door furniture to be removed and replaced with new where required. Affix new (brass hopefully) mail basket to interior right door.
Add a small period table (type and style still to be determined). *
Please Note: All attempts will be made to tidy up any damage to door woodwork but not all markings can be removed nor 100% eradicated - the door is 90 years old and as such will retain its veteran status in places.
Add 9 Wooden Mail Pigeon slots for Flats 1-9 Mail - (type and style of wood still to be determined). *
External Front door steps and surrounds will be cleaned thoroughly.
A new Brass fitment to underside of first step will be fitted.
A new Brass Bell display to replace existing unit.
The magnificent MITRE HOUSE signage above Front Door will be looked at to see if it can be jazzed up a bit - no, not neon regretfully! Hopefully a Brass colour look.
A new Coir 23mm industrial strength mat will replace the existing filthy excuse.
All existing, in close proximity and in situ, brass fitments will be polished or renewed.
* Items still to be decided on consultation with Residents Association APPENDIX (iii)_BRIEF GENERAL WORKS SPECIFICATIONS_1
EXAMPLES OF ITEMS TO BE IMPROVED
NOTES:
EXAMPLES OF ITEMS TO BE IMPROVED
Add decorative items as required - potted plants, pictures etc to be determined. *














































































   183   184   185   186   187