 SCOPE OF WORKS WADE DESIGN HEMI PROPERTY LTD
Surecast
SMB Building
ARG Contract
Works Location (Michele quote 2012) (Michele quote 2012) (Paul Brown quote 2012)
(Segar quote 2009)
( KFH quote 2009)
(KFH quote 2009)
          Marble Restoration
Clean & restore & seal External Marble step
Clean & restore & seal Terrazzo dado lining inner stairwell
Clean & restore & seal Window sills 1st, 2nd, 3rd Floor
Clean & restore & seal Terzzao stair treads, risers & stringers
Clean & restore & seal Terazzo landings & hallways
Clean & restore & seal Replace grout in enterance hallways
General items
Mirrors
Build & fit new meter cupoards On each floor
Build Pigeon Hole unit for mail Hallway
Clean brass kick pates, finger plates & handles Main Enterance Door
New entry panel in brass for front door Main Enterance Door
New brass door furniture for all flats All flat doors
Box in wiring TBC
Remove & replace with new brass handrail Hallway
Lift
Supply & fit veneered panels & mirror, brass rail & amtico floor Lift interior
De-grease & rub down Lift Doors
Paint with 2 coats Lift Doors
Clean mesh with steamers then seal Mesh
Electrics
Carry out inspection of electrical circuits Common areas
Install 2 x new lights Ground Floor Hallway
Supply 9 x lag swaitches Hallways
High level PLRS 1st & 2nd lobby areas
Woodwork
Clean & restore Main Front doors & inner lobby doors, inner doors Paintwork for walls, ceilings, windows & lift
Re paint all specified areas (2 colours & white) Materials supplied Enterance Hall, staircase, landing, lift lobby etc Utility Room
Windows Strip existing paint, restore & paint new
TOTAL
Optional Extras
Pigeon Hole in Oak Venner (instead of painted wood / MDF)
Fire Detection System Communal Hallways Install emergency lighting Stairwells Emergency light fittings Stairwells TVCablesdownthebackwall fromariel
Digital ariel Allowing free view TV Roof
Hall Mat Main Hallway
Hall Table Main Hallway
Brass console and brass handrail Main Hallway
Rear Yard - tidy & renovate inc drains Rear Yard
£ 441
£ 3,930
£ 944
£ 4,387
£ 4,874
£ 760 £ 17,000
£ 1,580 £ 1,250 £ 600 £ 820 £ 980 £ 1,200 £ 208 NONE £ 1,480 NONE
£ 12,500
£ 7,000 NONE £ 450 £ 1,500 NONE NONE £ 1,500
£   12,250 £     8,000
                                                      £ £
£ £ £ £
£
2,686
1,860 inc in paintwork inc in paintwork inc in paintwork
£
NONE
£
£ 2,900 £
NONE
5,650 £ 8,320
9,200 £
1,870
inc paintwork £
NONE 6,000
1,750 1,750
NONE
5,500
NONE 10,000 1,750
540 395 816 418 £
7,540 £
9,880 £ £
inc in paintwork
 NONE
£ 16,915 NONE
NONE
NONE
£ 10,241
     £ 44,319.00 £
£ 1,200 £ 3,800 £ 3,200 £ 800 £ 1,478 £ 679
48,210 £
49,700 £     47,406 £
53,299.00 £
58,026.00
  £ 11,157.00 £
£ 55,476.00
£ £ £ £
Please note: Paul's Quote also includes £750 for just cleaning the marble floor Pleasenotethatin2008 KFH(previousmanagingagent)quoted£20,00forcleaningthefloor
200 350 450
1,750
2,750.00
   