Page 264 - FINAL MASTER 616pp 20-6-19 SOUND
P. 264

 SCOPE OF WORKS WADE DESIGN HEMI PROPERTY LTD Surecast SMB Building ARG Contract Works Location (Michele quote 2012) (Michele quote 2012) (Paul Brown quote 2012) (Segar quote 2009) ( KFH quote 2009) (KFH quote 2009)           Marble Restoration Clean & restore & seal External Marble step Clean & restore & seal Terrazzo dado lining inner stairwell Clean & restore & seal Window sills 1st, 2nd, 3rd Floor Clean & restore & seal Terzzao stair treads, risers & stringers Clean & restore & seal Terazzo landings & hallways Clean & restore & seal Replace grout in enterance hallways General items Mirrors Build & fit new meter cupoards On each floor Build Pigeon Hole unit for mail Hallway Clean brass kick pates, finger plates & handles Main Enterance Door New entry panel in brass for front door Main Enterance Door New brass door furniture for all flats All flat doors Box in wiring TBC Remove & replace with new brass handrail Hallway Lift Supply & fit veneered panels & mirror, brass rail & amtico floor Lift interior De-grease & rub down Lift Doors Paint with 2 coats Lift Doors Clean mesh with steamers then seal Mesh Electrics Carry out inspection of electrical circuits Common areas Install 2 x new lights Ground Floor Hallway Supply 9 x lag swaitches Hallways High level PLRS 1st & 2nd lobby areas Woodwork Clean & restore Main Front doors & inner lobby doors, inner doors Paintwork for walls, ceilings, windows & lift Re paint all specified areas (2 colours & white) Materials supplied Enterance Hall, staircase, landing, lift lobby etc Utility Room Windows Strip existing paint, restore & paint new TOTAL Optional Extras Pigeon Hole in Oak Venner (instead of painted wood / MDF) Fire Detection System Communal Hallways Install emergency lighting Stairwells Emergency light fittings Stairwells TVCablesdownthebackwall fromariel Digital ariel Allowing free view TV Roof Hall Mat Main Hallway Hall Table Main Hallway Brass console and brass handrail Main Hallway Rear Yard - tidy & renovate inc drains Rear Yard £ 441 £ 3,930 £ 944 £ 4,387 £ 4,874 £ 760 £ 17,000 £ 1,580 £ 1,250 £ 600 £ 820 £ 980 £ 1,200 £ 208 NONE £ 1,480 NONE £ 12,500 £ 7,000 NONE £ 450 £ 1,500 NONE NONE £ 1,500 £   12,250 £     8,000                                                       £ £ £ £ £ £ £ 2,686 1,860 inc in paintwork inc in paintwork inc in paintwork £ NONE £ £ 2,900 £ NONE 5,650 £ 8,320 9,200 £ 1,870 inc paintwork £ NONE 6,000 1,750 1,750 NONE 5,500 NONE 10,000 1,750 540 395 816 418 £ 7,540 £ 9,880 £ £ inc in paintwork  NONE £ 16,915 NONE NONE NONE £ 10,241      £ 44,319.00 £ £ 1,200 £ 3,800 £ 3,200 £ 800 £ 1,478 £ 679 48,210 £ 49,700 £     47,406 £ 53,299.00 £ 58,026.00   £ 11,157.00 £ £ 55,476.00 £ £ £ £ Please note: Paul's Quote also includes £750 for just cleaning the marble floor Pleasenotethatin2008 KFH(previousmanagingagent)quoted£20,00forcleaningthefloor 200 350 450 1,750 2,750.00    


































































































   262   263   264   265   266