Scope of Works - Mitre House, Kings Rd (614)
    614 Mitre House, 124 Kings Road, London SW3 4TP
Refurbishment of the Common Parts
 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 3.2.10 3.2.11 3.2.12
3.2.13
3.2.14
3.2.15
The fire door and frame leading out onto the fire escape is to be rubbed down, prepared and decorated in accordance with manufacturer's recommendations.
All glazing to the fire door and fanlight is to be thoroughly cleaned to remove all stains and marks.
The blanking plate adjacent to the fire door is to be removed and disposed of. A new brass blanking plate is to be installed in its place.
The ceiling is to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats of good quality paint.
The walls are to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats of good quality paint. Colours to be agreed with the client.
The upstand at the base of the wall is to be professionally cleaned to remove all stains and marks. The colour is to be revitalised and left in good order.
All cabling is to be tested and redundant cabling removed. The remainder of cabling is to be boxed in, unless it can be neatly clipped in place.
The entrance doors, frames and adjacent panelling currently finished with a varnish coating are to be rubbed down, prepared and re-varnished. Colour of varnish to be agreed with the client.
The areas of previous water ingress are to be have all damaged plaster removed back to a sound key. New plaster is to be installed and feathered back to the adjacent edges, prior to redecoration.
The contractor is to present options to the C.A. for either replacing the existing lobby doors with new items to ensure they are FD30 or better, so as to comply with Building Regulations, or confirm if the existing can be made to perform as FD30 or better fire doors. The contractor will also need to confirm if the half glazed panels to the lift lobby also need to be replaced.
The floor surface in the lift lobby and also adjacent to the Tenant flats is to be thoroughly cleaned. This may include honing, sealing and polishing the floor to revitalise the finish.
1no 5no 1no Item Item Item Item 3no
1m2 1no
Item
               3.3 3rd Floor (Lift Lobby Area)
3.3.1 The contractor is to rub down, prepare and decorate the 2no sections of timber panelling to either 2no side of the lobby doors in colours to be agreed with the client.
3.3.2 The plant pots and stands located on the staircase are to be carefully removed and disposed of if 2no not claimed by one of the Tenants.
3.3.3 The sign located adjacent to the loft hatch in relation to the lift machinery is to be carefully 1no removed.
3.3.4 The loft hatch and frame are to be rubbed down, prepared and decorated with 1no undercoat and 1no 2no top coats of good quality paint.
3.3.5 The ceiling is to be rubbed down, prepared and decorated with 1no undercoat and 2no top coats Item of good quality paint.
3.3.6 All paintings attached to the walls are to be carefully removed and stored safely for the Item owner/Tenant to claim.
3.3.7 The cupboard located outside the lift car to the lobby is to be removed and disposed of. All 1no contents within the cupboard are to be stored for the owner to reclaim.