Project Name: Firm: Owner: Client: Key Partners:
Kenmawr Bridge Replacement
SAI Consulting Engineers, Inc.
Allegheny County Department of Public Works
Pennsylvania Department of Transportation, District 11-0
Pennsylvania Department of Transportation, District 11-0, Allegheny County Department of Public Works, Swissvale Borough, Rankin Borough, Port Authority of Allegheny County, Norfolk Southern Railway Company, Golden Triangle Construction Company, Pennsylvania Department of Transportation, District 11-0 Construction, Michael Baker International, RIG Consulting, Inc., Tri-State Design and Development, AWK Consulting Engineers, Inc., CDR Maguire, Inc., Century Engineering, LLC, A Kleinfelder Company, T2 UES, Inc., d/b/a T2 Utility Engineers, and Santangelo & Lindsay, Inc.
The Kenmawr Bridge Project located in Swissvale and Rankin boroughs in Allegheny County, Pennsylvania, replaced a structurally deficient single-span steel structure with a new 122-foot, two span, steel
girder bridge that crosses Norfolk Southern Railroad Company’s rail lines. The new bridge required 3 to 4 feet of vertical clearance over the existing rail lines requiring significant approach roadway, wall, and
utility reconstruction. The bridge was also lengthened for the future expansion of the PAAC’s East Busway. The construction required the installation of a temporary bridge and roadway throughout the majority of the construction to maintain traffic.
Project Name: Firm: Owner: Key Partners:
Rickert Road (Bridge 21) Over Morris Run
Taylor Wiseman & Taylor
County of Bucks
Michael Baker International, CHRS, Schnabel Engineering, LLC, Medveczky Associates, LTD, County of Bucks, Grace Industries, and Pennsylvania Department of Transportation, District 6-0
The project goal was to replace a 1908, historically eligible, one-way single-span, concrete-arch bridge. The bridge was load-restricted for 4 tons and substandard in bridge width, also having a “hump” condition in the roadway caused by the bridge. Due to poor condition, the bridge was closed to traffic in 2011, causing a several-mile detour. To replace the bridge as fast as possible, the new structure was constructed entirely of precast concrete elements and, by including the precast
design into the contract documents, the bridge was completed in eight months.