Page 37 - ICG Full Business Plan
P. 37

Projects History (continued)
ETC Completed Project: U.S. Forest Service – Alaska
Project:
Client:
Consultant:
Soil volume:
Soil type: Contamination type: Pre-treatment levels: Post-treatment levels: Authority:
Lancaster Cove / Tonka U.S. Forest Service
Jacobs Engineering Group 1074.79 tons
Clay, sand
Diesel Range Organics
18,000 ppm
All samples <100 ppm
Alaska Department of Environmental Conservation
ETC Completed Project: Chevron Products Company – Alaska
Project:
Client:
Consultant:
Soil volume:
Soil type: Contamination type: Pre-treatment levels: Post-treatment levels: Authority:
Former Airport Chevron Station 9-4875 Chevron Products Company
RRM, Inc.
367.31 tons
Clay, sand
Gasoline Range Organics, Diesel Range Organics, Residual Range Organics 400 ppm,. 25,100 ppm, 15,400 ppm
All samples <50 ppm, <100 ppm, < 230 ppm
Alaska Department of Environmental Conservation
ETC Completed Project: McDonnel Douglas – California
Project:
Client:
Consultant:
Soil volume:
Soil type: Contamination type: Pre-treatment levels: Post-treatment levels: Authority:
Fullerton, CA.
McDonnel Douglas
EAR Management
2,250 tons
Inorganic silts, micaceous or diatomaceous  ne sands-silts, elastic silts Machine Oil, Heavy Oil
14,000 ppm, 4,400 ppm, 3,800 ppm
Below regulatory levels: <100 ppm
Orange County Health Department
ETC Completed Project: Unocal – OR
Project:
Client:
Soil volume:
Soil type: Contamination type: Pre-treatment levels: Post-treatment levels: Authority:
Unocal Bulk Plant, Oakridge, OR. Unocal
1,536 tons
Gravel  ll and native silt
Heavy Oil
2,700 ppm, 660 ppm, 8,200 ppm
Below regulatory levels
Oregon Department of Environmental Quality
34


































































































   35   36   37   38   39