Page 12 - R LINE GUIDE_AUGUST 26ang.indd
P. 12

12 RLINE
 BRAS: INSIDE UNITS
Set up product in both units and sign accordingly.
MERCHANDISE ALL STYLES TOGETHER.
Group in drawers per cup size.
max. 25x
INSTALL METAL INSERT.
 1
Do not store bras folded in half as it will damage the cup.
         2
Install the metal insert on the top of the left unit, as showed below, and place the P.O.P. magnet on top of it.
top of unit
     3
INSTALL ID INSERTS.
Simply insert them on the edge of the drawers. Make sure to store safely in the backstore the SALE insert. Detailed information on the sale strategy will be available later.
                  example
 


















































































   10   11   12   13   14