 BRAS: WALL STRUCTURE
Once units have been installed, you may start your wall structure following steps below.
INSTALL THE BRA UNITS.
This step is crucial and should be done prior to everything else.
Make sure these units are safely secured to the wall to avoid any customer injuries. See sketch below for how to do so. Video also available here.
 1
          STEP 1
Install 4 ft. flat bars (2x).
Let delivery men push the units to the
STEP 2
Slide the metal connectors (2x) into the metal piece at the back of the unit AND the flat bar.
METAL CONNECTOR
BACK METAL PIECE
                                              wall, towards the 4 ft. flat bar.
FLAT BAR
WALL
FLAT BAR
                      FLAT BAR
METAL CONNECTOR
30’’ approx.
                2
3
INSTALL WHITE HARDWARE IN THE WALL.
To do so, see the sketch to your right.
INSTALL HARDWARE REQUIRED FOR P.O.P.
 For large images: install 4 ft. flat bars with double sided-tape. For product knowledge: install 4x face-out with double side-tape.
STORES WITH DIVIDERS
OR
                                   DOUBLE SIDED TAPE ON FACE-OUT
DOUBLE SIDED TAPE DIRECTLY ON DIVIDER