Page 4 - Fishman_FOCAP_SUPPORT_Catalog
P. 4
Fiber Optic Connector Assembly Program (FOCAP)
Validation Support Program
The testing process
1. Determine Dispense Program
3. Attach Full Syringe
TASK 1
Meet with Fishman® Application
Engineers, professionals with
vast knowledge of applying
7. Master Capabilities Report
TASK 4
Fishman® Application Engineers save the dispense program—determined and verified through testing—to the SmartDispenser®’s memory.
TASK 2
Preform a weight study,
documenting statistical data such
as mean, standard deviation and
8. I
TASK 3
Once everything is approved, Fishman® Application Engineers set up the dispense program.
2. Save Program
4. Perform Weight Study
5. Pull Production Report
6. Determine Weight & Tolerance
assembly fluids during the manufacturing process.
repeatability. Fishman® Application Engineers also assemble customer parts for inspection.
TASK 5
ssue Program Specification
Install the SmartDispenser® and begin producing products within minutes, not days.
Fishman Corporation 192 South Street, Hopkinton, MA 01748, United States
US & Canada: 800.433.2115 | Worldwide: 1.508.435.2115 | www.fishmancorp.com 4
T
T
H
H
T
T
A
A
O
O
R
R
G
G
R
R
E
E
I
I
E
E
+
+
P
P
L
L
W
W
/
/
-
-
T
T
T
T
O
O
E
E
G
G
R
R
A
A
N
N
C
C
E
E
T
T
C
C
U
U
D
D