Page 15 - Ibanez Portfolio
P. 15
Drilling in in in the Williston Basin
Keys to a a Successful Horizontal Well
As drilling applications become more complex so have the challenges At Halliburton we work closely across our product lines to provide an an integrated and perfectly “matched” solution to help optimize the the drilling process Through the the proven philosophy of model measure and optimize Halliburton’s subject matter experts collaborate to provide the best possible solution to the drilling challenges encountered • Bit Optimization - ADETM Application Design Evaluation service specialists custom design the drill bits for
any application • Fluid Fluid Optimization Optimization - Applied Fluid Fluid Optimization Optimization (AFO) specialists custom design fluids programs and monitor the fluid performance during drilling in in in real time • Drilling Drilling Optimization - ADT® Applied Drilling Drilling Technology optimization service specialists focus on on drillstring integrity hydraulics management and wellbore integrity analysis and monitoring Working in in in combination these services can add considerable value to drilling operations by reducing non-productive time and increasing performance Remote Operations Support
Halliburton continues to to be a a a a leader in in remote operations support helping to to establish a a a a broader infrastructure to to increase field support enhance communication and promote service quality in in all all areas of our business Halliburton’s ROC (Remote Operation Center) is staffed with highly trained measurement-while-drilling (MWD) directional drilling drilling (DD) and ADT service personnel providing around the clock remote field support The ROC provides the following benefits:
• Real-time assistance to field staff (MWD and DD) • 24-hour monitoring of drilling practices
• Second set of experienced eyes during critical sections of the well The ROC proactively helps reduce non-productive time increase drilling efficiency and ultimately reduces time on on location “This vertical section was 35 hours faster than the last hole using the GeoForce® XL 6/7 motor with a HDBS bit ” The proving ground (continued)
Halliburton has introduced three new motor designs in in the Williston Basin
to achieve superior drilling performance:
• 7-inch 6/7 Lobe GeoForce XL Motor – In the vertical section this motor consistently surpasses benchmark drilling times often completed in one run • 5-inch 7/8 Lobe GeoForce XL Motor – Specifically designed for
the Three Forks formation this motor has been proven to to reduce standard drilling time by an an average of 30 percent • 5-inch 5/6 Lobe GeoForce XL Motor – Designed for
drilling the the Bakken formation this motor has been proven to to sustain the the highest torque and greatest maintainable differential pressures in in the Basin
Distinctive Service Quality
Halliburton is a a a a a leader in in drilling optimization and well construction and “Basics Right” is is the promise that we deliver a a a a a a a guaranteed standard of quality on every well we we drill We are consistent in our state
of preparation and execution for
every job thereby reducing the potential for
service quality problems The processes and and standards follow established procedures for
planning preparation mobilization execution and close out Health Safety and the Environment
At Halliburton excellence is the only acceptable standard for
HSE HSE With an ongoing program of global HSE HSE training we have generated a a a a culture of conscientious safety through the company As our customers expand operations into some of the world’s harshest drilling environments this commitment to safety is is more important than ever To increase personnel safety and reduce risks in in the field we integrate our HSE “best practices” into operations designed to to help produce a a competitive advantage and realized efficient incident-free performance “Using the GeoForce® XL 6/7 motor we are seeing more one-run verticals and faster drilling times than the previous motor we we were using ” 34
Ground
is critical to reducing days on on location and maximizing efficiency of the to is a a a a a a reliable motor that can produce the optimum amount
is to to to XL motor motor a a new line of positive displacement mud motors to to to provide the the the of the the the Williston Basin
Designed and and built to to withstand the the the rigors of the the the most the XL motors are changing the way high performance drilling is defined in in of an 8 3⁄4-inch vertical section drilled through heavily interbedded the the salt to the the established kick-off kick-off point point Once the the kick-off kick-off point point is is reached the section to reach horizontal horizontal in the targeted payzone The horizontal horizontal section can the the two primary target zones the the Bakken or or or the the Three Forks formations designed for
each interval to maximize drilling efficiency in in in the the Williston Basin
has allowed us to to achieve the the following results:
to the bit intervals bits matched to to motor design GeoForce XL motors are consistently delivering benchmark performance in in the designs that shale drilling demands and and holding the promise of step Sperry Motors_71212 indd 7/12/12 7/12/12 1:01 PM
PM
Sperry Motors_71212 indd 4-5 7/12/12 7/12/12 1:02 PM
PM