 1. Infrastructure business :
Consisting of 1) Energy and renewable energy business and 2) the construction business.
1.1) Energy and renewable energy business
The company has invested in a solar rooftop project with a capacity of approximately 3.67 megawatts, operating under the following companies:
• W. Solar Co., Ltd. (“W.SOLAR”), an associated company Solar Rooftop Power Generation Business. Solar panels are located on the factory roof, Wyncoast Industrial Park Public Company Limited with the production capacity of approximately 0.98 megawatts and the investment amount of 39.20 million baht which accounts to 49.00% of paid-up registered capital. At present, the production capacity has been expanded to a total capacity of 1.67 megawatts, installed on the roof of the office of Wyncoast Industrial Park Public Company Limited and the roof of the parking lot of Wyncoast Industrial Park Public Company Limited which can be used as a commercial electricity.
• Bangpakong Solar Power Company Limited (“BSP”) is a subsidiary with the production capacity of 0.75 megawatts and the investment size of 24.99 million baht, representing 51.00 percent of the paid-up capital. The BSP project has already installed solar panels and began Commercial Operation Date (COD) since February 2017. So far, the production capacity has been expanded outside of the Wyncoast Industrial Park. Production capacity is approximately 214.50 kilowatts. It can be sold commercially totally. In the future, the company has a project to expand production capacity by 10 percent of the original production capacity.
• 105 Solar Power Company Limited (“105”) is an associated company with the production capacity of 0.77 megawatts and the investment size is 17.30 million baht, representing 44.36 percent of the paid-up capital. The project of 105 has already installed solar panels and began selling commercial electricity (COD) since December 2018. At the present, the production capacity was expanded outside the Wyncoast Industrial Park. The production capacity is 259.70 kilowatts and the company has a project to expand production capacity by 10 percent of the original production capacity.
1.2) Construction business
As the company has been in the solar energy business for a long period, it has expertise and knowledge in technology. The Company sees that solar energy is clean and environmentally friendly. Constantly declining panel and equipment prices together with better technology than in the past make this business has the potential to develop. These factors are the incentives for more people to install solar panels. The company is ready and has potential in this business. Therefore, the company decided to enter the solar system installation contractor business. The company operates a contractor business by ACC Infra Co., Ltd (“ACCI”) where the company has been contracted to install solar system for both public and private sectors such as BPS technology public company limited, WIROON & GWYNESS COMPANY LIMITED, DON MUANG TOLLWAY PUBLIC COMPANY LIMITED, SUPER ICE COMPANY LIMITED and a lot solar system installation projects for housing, with a total installation size of more than 2 megawatts.
However, there are projects that are developing projects and are in the process of signing contracts for rooftop solar power generation systems with state enterprises and private agencies, another 20 megawatts, which are in the process of developing projects to achieve contracts.