Page 325 - Annual Report Design 2023-2021
P. 325

ภาพรวมการประกอบธุรกิจ
Chiang Mai Sukhothai
 Laos
Thailand
Vientiane,Laos
Khon Kaen
Nakorn Ratchasrima
                        Ayudthaya
     Bangkok
 Samutprakarn Rayong
Surat Thani
                        Plant In Operation
Office & Warehouse
Location
      UAC Group Head Office
Bangkok
        UAC Branch Office
Rayong
        UAC & UAPC Warehouse
 Product
Bang Pu – SamutPrakarn
 Location
          Mae Taeng
Electricity @ 1.5 MW
Chiang Mai
            PPP
NG Pipe Line
CNG / LPG / NGL
Sukhothai
            1.2 mmscfd
Sukhothai
            Power Plant
Electricity @
Sukhothai
            •STA
3.9 MW
          •PDT
3.0 MW
            Solar PV Rooftop
Electricity @
            •SHT
924.56 kW
Samutprakarn
            •VBD
750.20 kW
Surat Thani
            Latex Emulsion
24,000 TPY
Nakorn Ratchasrima
          BBF (Plant 1 & 2)
Biodiesel 1,000,000 lpd
Ayutthaya
    Plant under Construction           Capacity
Location
       PPM           Electricity @ 3 MW VWM
•Electricity           6 MW
•Plastic Recycled           13,200 tons/year
•Chemical Fertilizer
Khon Kaen Vientiane, Laos PDR.
                                 30,000 tons/year
    รายงานความย่ังยืน 2564
7





































   323   324   325   326   327