Page 325 - Annual Report Design 2023-2021
P. 325
ภาพรวมการประกอบธุรกิจ
Chiang Mai Sukhothai
Laos
Thailand
Vientiane,Laos
Khon Kaen
Nakorn Ratchasrima
Ayudthaya
Bangkok
Samutprakarn Rayong
Surat Thani
Plant In Operation
Office & Warehouse
Location
UAC Group Head Office
Bangkok
UAC Branch Office
Rayong
UAC & UAPC Warehouse
Product
Bang Pu – SamutPrakarn
Location
Mae Taeng
Electricity @ 1.5 MW
Chiang Mai
PPP
NG Pipe Line
CNG / LPG / NGL
Sukhothai
1.2 mmscfd
Sukhothai
Power Plant
Electricity @
Sukhothai
•STA
3.9 MW
•PDT
3.0 MW
Solar PV Rooftop
Electricity @
•SHT
924.56 kW
Samutprakarn
•VBD
750.20 kW
Surat Thani
Latex Emulsion
24,000 TPY
Nakorn Ratchasrima
BBF (Plant 1 & 2)
Biodiesel 1,000,000 lpd
Ayutthaya
Plant under Construction Capacity
Location
PPM Electricity @ 3 MW VWM
•Electricity 6 MW
•Plastic Recycled 13,200 tons/year
•Chemical Fertilizer
Khon Kaen Vientiane, Laos PDR.
30,000 tons/year
รายงานความย่ังยืน 2564
7