Page 1 - LAPORAN PEMINJAMAN BARANG SPI7.2 Update 00
P. 1
PT Bukit Energi Servis Terpadu
LAPORAN PEMINJAMAN BARANG
1. PEMINJAMAN PLTU TE 3X10ME KE PLTU TARAHAN 2X8MW
NAMA BARANG JUMLAH TANGGAL PINJAM TANGGAL KEMBALI KETERANGAN
PINJAM
Semen Shiracrete 80 6 Sacs 31/01/2022 27/05/2022 (2 Sacs) Dikembalikan dengan semen
30 Sacs 10/03/2022 24/06/200 (5 Sacs) benteng api TNC-170LC (Total
Pinjam 51 Sacs dikembalikan 7
Sacs sisa 44 Sacs
Semen Shirapatch WR80i 15 Sacs 17/02/2022
Pelumas Oli GC Lube M46 60 Liter 24/05/2022 14/01/2023 (50 Liter) Dikirim 2 Dirigen @25Liter, sisa
50 Liter 02/08/2022 pinjam 60 Liter
Valve DN20 PN 100 4 Set 07/12/2022 - -
Packing SWG DN20 16 Ea 07/12/2022 - -
Elektromotor 15kW , 1500 1 Set 08/09/2021 - -
Rpm untuk Mixer Ash Silo
KETERANGAN
1. PEMINJAMAN DARI PLTU TE 3X10MW KE PLTU LHOKNGA 2X16,5MW
NAMA BARANG JUMLAH TANGGAL PINJAM TANGGAL KEMBALI KETERANGAN
PINJAM
Safety Valve Steam Drum 1 Set 06/06/2022 01/02/2023 Close
DN80 PN100
Safety Valve Steam Header 1 Set 06/06/2022 01/02/2023 Close
DN80 PN100
MOV Steam Blow DN225 PN 1 Set 09/09/2022 -
100
Sensor Temperature thrust 5 Set 27/07/2022 14/11/2022 Close
Bearing Turbine

