Special Specification 3057
Reinforcement Grid for for Asphalt Pavement
1 2
2
1 DESCRIPTION
Furnish and place reinforcing grid for for asphalt pavement MATERIALS
Grid Provide a a a a a a a a a uniform glass-fiber grid coated with a a a a a a a a a synthetic elastomeric polymer and a a a a a a a a a self-adhesive
backing of of one of of the following two types:
Type Type I I I for placement placement over over the the entire width of the the roadway Type Type II placement placement over over in in in transverse and longitudinal joints Provide a a a a a grid that will:
Resist Resist damage and and maintain dimensional stability during construction Resist Resist chemical and and and biological degradation by the the material being reinforced and and and Meet the requirements of Table 1 Provide a a a a a a a a test report from from the the the manufacturer or or from from a a a a a a a a third party certifying that the the the grid meets all of of the the the requirements of this specification Provide rolls of of grid in in in widths appropriate to to to the the the work being performed or or or or or or of of the the the width width shown on the the the plans for for Type II Each roll roll must must be be be be packaged in in in in in in a a a a a a a a a a a a a a a a a a a a a a protective wrap to to to to prevent damage under normal storage and and and handling including ultraviolet degradation and and and must must be be be identified with a a a a a a a a a a a a a a a a a a a a a a tag or or or or or label securely affixed to to to the the the outside of the the roll on on on on or or near one end displaying the the following information:
unique roll number number number serially designated manufacturer's lot number number number or control numbers if any name name of of manufacturer manufacturer brand name name of of product style or catalog designation of of the product product and and and roll width and length Store the the the grid in in in dry covered conditions free from dust and stock vertically to to to to avoid misshapen misshapen rolls rolls rolls Do not use misshapen misshapen rolls rolls rolls or or or rolls rolls rolls stored in in in direct sunlight unless otherwise approved by the the the Engineer Sampling Sampling Sampling Sampling Sampling Sampling of reinforcement grid is performed in in in in in accordance with Texas Test Method
Tex-735-I “Sampling Construction Fabrics ”
The The Department Department will will collect at at least one sample sample from the the the project and and and test test for for acceptance The The Department Department will will will sample sample and and and and test test test test all materials materials materials however the the the the Contractor must be be responsible for for the the the the costs of of sampling sampling and and and and testing testing failing failing materials materials materials Costs of of of of sampling sampling and and and and testing testing failing failing materials materials materials will will be be assessed at at at at at at the the the the the the rate established by the the the the the Director of of of of the the the the the Materials and and and Pavements Section of of of of the the the the the Construction Division and and and in in in in in in in effect at the the time of testing 2
1 1 1 1 p16