Page 9 - GLASGRID GLASPAVE BROCHURE
P. 9
GlasGrid GP50
Glass/PET hybrid paving mat
PP non-woven
p7
900 600
5%
5 5 5 0% 5 5 5 5%
2400 2100 1800 1500 1200
900 600
6
6
0% 6
6
5%
0 0 5%
1 0% GlasGrid GP25
1 5%
2 2 0% 2 2 5 5 Pe
Load vs Elongation Cu
0 0 Gla Gla Gla Gla yalrevO weN PG dirGsalG ralunarG esaB
edargbuS
reta
Asphalt Interlayer Engineer's Guide
Surfaces
Milled Existing Level Ups
Surfaces
Reccomended Tack Coats:
UltraFuse Bond Seal
Jebro Inc Polymer Modified Asphalt Cement Underseal Membrane
Tackcoats
PG PG 64
PG PG 70 AC 20‐5 TR
Tackcoats
GlasPave 25 & 50
Tack Coat Rate
Milled 20 gal/yd gal/yd or or greater greater Existing 17 gal/yd gal/yd gal/yd or or or greater greater greater Level up 13‐ 15 gal/yd gal/yd or or greater greater Equipment
Rubber tire roller to ensure fabric‐tack coat bond Surface Temperatures for Tack Coat Selection
< 80 degrees PG64
GlasGrid 8511 & 8512 Tack Coat Rate
Milled ‐ NOT RECOMMENDED
> 80 degrees PG 70 AC 20‐5 TR
Equipment
Rubber tire roller to ensure fabric‐tack coat bond Existing Hot Hot Applied Applied Track Track Free Free Hot Hot Applied Applied Track Track Free Free ultra‐fuse com
jebro com
Existing 17 gal/yd gal/yd or or greater greater Level up 13‐ 15 gal/yd gal/yd or or greater greater rves Using ASTM
D5035 Level Ups
Surface Temperatures for Tack Tack Coat Coat Selection
All Tack Tack Coats temp recommend 40 degrees and rising
%
%
3 0% rcent Elongation Q&A
1 Is construction construction traffic traffic allowed on on on on on on the products during installation?
All construction construction traffic traffic traffic is permitted Steel drum rollers are excluded from the the the tolerance 2 Is public/transportation traffic traffic traffic allowed allowed on on on on on the the products products during installation?
For both products products minimal traffic traffic is allowed allowed however product product product product should be be covered by asphalt same day day as as product product product product application 3 How many linear lane mile mile be be installed on on on a a a a a a a a a a a a a a a a a a a a standard condition 8‐hour day?
An Industrial Fabrics Inc crew can install install 8 8 miles a a a a a a a a a a a a a a a a a a a a a day day of GlasPave or GlasGrid 4 Can material stay uncovered over over night?
Yes however recommend applying asphalt asphalt asphalt same day or or within within 24 24 hours hours If asphalt asphalt asphalt cannot be be applied within within 24 24 hours hours material material and site to to be inspected daily prior to to asphalt asphalt appilcation 3 5%
5%
5%
5%
4 4 0% 0% 0% 4 4 5%
5%
5%
5%
5 5 5 5 5 5 0% 0% 0% 5 5 5 5 5 5 5%
5%
5%
5%
6
6
0% 0% 0% 6
6
5%
5%
5%
5%
Tensile Strength N/5 cm
Asphalt Saturated Paving Interlayer Delays Reflective Crack Return
life
HMA-RHMA Overlay reyalretnI gnifoorpretaW esaB
ralunarG stcetorP
Surface water intrusion into base
Moisture Barrier
Seals cracks to keep water out of base
Preserves load bearing capacity
enarbmeM gnifoorpreta Single chip seal Existing Cracked Pavement