with the use of Envirotubes® and or Envirotube®systems, including the with the use of Envirotubes® and or Envirotube®systems, including the
use or handling of hazardous materials, mechanical equipment and use or handling of hazardous materials, mechanical equipment and
operations. operations.
It is the responsibility of the contractor to establish and adopt It is the responsibility of the contractor to establish and adopt
appropriate safety and health practices. Also, the contractor shall appropriate safety and health practices. Also, the contractor shall
comply with prevalent regulatory codes such as OSHA regulations comply with prevalent regulatory codes such as OSHA regulations
while using these guidelines. while using these guidelines.
Overview Overview
The following sections address the preparation and placement of the The following sections address the preparation and placement of the
Envirotubes® as well as the filling procedure. Envirotubes® as well as the filling procedure.
These guidelines do not purport to address the safety issues associated These guidelines do not purport to address the safety issues associated
13 13