Page 13 - McWane Poles Product Brochure 2024
P. 13

   TIP LOAD, MINIMUM CAPACITY, KIPS APPLIED 2 FEET BELOW POLE TIP
Length Class 3 Class 2 Class 1 H1 H2 H3 H4 H5 H6 H7 H8 H9 11.7KIP 12.8KIP 16KIP 20KIP
All 1.95 2.41 2.93 3.51 4.16 4.88 5.66 6.5 7.41 8.39 9.43 10.53 11.7 12.8 16 20
BENDING MOMENT, MINIMUM CAPACITY, KIP-FEET AT GROUND LINE
Length
Class 3 Class 2 Class 1 H1 H2 H3 H4 H5 H6 H7 H8 H9 11.7KIP 12.8KIP 16KIP
20KIP
      30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
105
110
43.9 54.1 65.8 79.0 93.6 109.7 127.2 146.3 166.7 188.7 212.1 236.9 263.3 288.0 360.0
450.0
52.7 64.9 79.0 94.8 112.3 131.6 152.7 175.5 200.1 226.4 254.5 284.3 315.9 345.6 432.0
540.0
62.4 77.0 93.6 112.3 133.1 156.0 181.0 208.0 237.1 268.3 301.6 337.0 374.4 409.6 512.0 640.0
71.2 87.8 106.8 128.1 151.8 177.9 206.4 237.3 270.5 306.1 344.0 384.3 427.1 467.2 584.0
730.0
80.0 98.6 119.9 143.9 170.6 199.9 231.9 266.5 303.8 343.8 386.4 431.7 479.7 524.8 736.0
820.0
     88.7 109.4 133.1 159.7 189.3 221.8 257.3 295.8 337.2 381.5 428.8 479.1 532.4 582.4
97.5 120.3 146.3 175.5 208.0 243.8 282.8 325.0 370.5 419.3 471.3 526.5 585.0 640.0
106.3 131.1 159.4 191.3 226.7 265.7 308.2 354.3 403.8 457.0 513.7 573.9 637.7 697.6
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
   115.1 141.9 172.6 207.1 245.4 287.6 333.6 383.5 437.2 494.7 556.1 *
123.8 152.7 185.7 222.9 264.2 309.6 359.1 412.8 470.5 532.4 598.5 *
132.6 163.5 198.9 238.7 282.9 331.5 384.5 442.0 503.9 570.2 640.9 *
* *
* *
* *
* *
* *
* *
* *
* *
* *
   *
*
*
*
*
*
174.4 212.1 254.5 301.6 353.4 410.0 471.3
185.2 225.2 270.3 320.3 375.4 435.4 500.5
196.0 238.4 286.1 339.0 397.3 460.9 529.8
* 251.6 301.9 357.8 419.7 * *
* 265.2 317.7 376.5 441.2 * *
* 278.4 333.5 395.2 463.1 * *
* *
* *
* *
* *
* *
* *
* *
* *
* *
* *
* *
* *
       Maintenance free poles after installation (we like to call it set it and forget it!!)
TM
Even though the initial purchase price of ductile iron is more than wood, life-cycle cost comparisons, which include items such as reduced maintenance over all those years as well as lower shipping and installation costs, can more than make up the initial cost difference.
  2024 BROCHURE
13
   11   12   13   14   15