Page 156 - Annual Report Design 2017
P. 156

 013
 1. DETAILS OF INVESTING TRUST’S REAL ESTATE
                                    IMPACT ARENA
GENERAL INFORMATION
Curtained in 1998, 5-story building is designed and constructed as 5 levels grandstand with 11,440 seats with 24-meter ceiling height
• 1st floor: flat floor for stage and seats with movable grandstand, and organizer's room
• 2nd organizer’s room, changing room and
staff’s arranging room
• 3rd floor: artist dressing room, and VIP room
with 25 separated galleries
• 4th floor: grandstand with control room on the top
LAND
Certificate of title 30051, parcel number 12, with area of land 76 rai 1 ngan 53.7 square wah
GROSS FLOOR AREA
41,810 sq.m. including net leasable area and public area
NET LEASABLE AREA
16,294 sq.m. including service space and long-term rental/service space
SYSTEM
Main public utilities including electrical system, water cooling system, air-conditioning system, ventilation system, sanitation system, safety and security system, fire prevention and response system, fire alarming system, light and sound system, communication and radio link system
                                                           















































































   154   155   156   157   158