Page 153 - Annual Report Design 2017
P. 153
IMPORTANT EVENTS OF THE TRUST’S OPERATION WITHIN FISCAL YEAR
During April 1, 2016 – March 31, 2017
there were significant events on the Trust’s operation as follows;
IMPACT Exhibition Management Co., Ltd. as the Property Manager had constructed the linking bridge between IMPACT Challenger and IMPACT Exhibition Center (Hall 1-8) by passing through The Portal which is the asset of IMPACT Exhibition Management Co., Ltd. At present, the construction had been completed and resulted the Trust to have the linking ways as follows;
- Linking way to IMPACT Exhibition Center ( Hall 1 ) Lobby and the escalator from the linking bridge links to IMPACT Exhibition Center (Hall 1) Entrance
- Linking way to the second floor of IMPACT Challenger and the escalator links to Royal Jubilee Foyer at level1 of IMPACT Challenger
- Linking way to the third floor of IMPACT Arena The overall development of this project will benefit to the Trust including visitors who will receive more convenient in using the Trust’s assets that have been linked together.
010