Lifting Operation Plan
This is the agreed plan for all lifting operations and must be completed in full before the craneage / lifting operation can commence. If any item changes after the plan is agreed then the plan MUST be reviewed.
Project:
Site Address:
Client:
Lift Date
Gold Cup
Cowdray Park
Cowdray Park Polo Club
Site Hazards Applicable
Comments / Control Measures
Overhead Services Yes / No
Underground Services Yes / No
Ground Stability Yes / No
Obstructions / structures Yes / No
Adjacent Activities Yes / No
Path of the load Yes / No
Path of the load Yes / No
Weather Conditions Yes / No
Other Yes / No
Loads to be Lifted
Lift 1 Lift 2 Lift 3
Description of load to be lifted: packs of bricks, RSJs, trusses etc
Load size: Length, Width, Height, Weight (including weight of lifting accessories)
Radius of Lift
Control of the load
Risk Assessments / Method Statements Yes / No Yes / No Yes / No required?
Yes / No
Height of Lift
Risk Assessments / Method Statements signed off?
Yes / No
Yes / No