   Lifting Operation Plan
This is the agreed plan for all lifting operations and must be completed in full before the craneage / lifting operation can commence. If any item changes after the plan is agreed then the plan MUST be reviewed.
    Project:
   Site Address:
  Client:
  Lift Date
 Gold Cup
Cowdray Park
Cowdray Park Polo Club
              Site Hazards Applicable
Comments / Control Measures
     Overhead Services Yes / No
     Underground Services Yes / No
     Ground Stability Yes / No
     Obstructions / structures Yes / No
     Adjacent Activities Yes / No
     Path of the load Yes / No
     Path of the load Yes / No
      Weather Conditions Yes / No
      Other Yes / No
                 Loads to be Lifted
         Lift 1 Lift 2 Lift 3
         Description of load to be lifted: packs of bricks, RSJs, trusses etc
        Load size: Length, Width, Height, Weight (including weight of lifting accessories)
               Radius of Lift
         Control of the load
         Risk Assessments / Method Statements Yes / No Yes / No Yes / No required?
       Yes / No
   Height of Lift
Risk Assessments / Method Statements signed off?
Yes / No
Yes / No
   This Form prepared by S3k Limited for work at , Goodwood Estate, - Goodwood Project Name - Goodwood Client - The Goodwood Road Racing Company Limited
APPROVED