Page 74 - Cowdray Gold Cup 2021
P. 74

  Plant Guidance Inspection / Pre-use Checklist
It is the responsibility of the Operator to ensure that this checklist is completed prior to the plant being operated. Reference must be made to individual machines handbook in case of any specific requirements. Any faults / defects are to be reported and an assessment made as to whether the plant is safe to operate, or
the fault needs rectification prior to operation. If doubt exists, the issue is to be referred to the site manager
    Type of Plant: Serial No:
     Date: Time: Weather Conditions:
     Operator's Name: Company:
         Proof of training provided: Yes: No: CPCS IPAF CITB Other
        Other Training Provider: Valid from/to Dates:
     Start Hours: Finish Hours: Fuel Start: Fuel Finish:
       Item:
 Servicable:
 Fault
YES
NO
N/A
Engine Oil
Hydraulic Oil
Transmission Oil
Coolant Level
Brake Fluid Level
Battery Condition
Lights & Indicators
Warning Beacon
Reversing Horn & Lights
Brake Lights
Gauges
Body Work
Wheel & Tyre Condition
Parking Brake
Seat Belt
Wipers
Washer Bottle Level
Horn
Steering / Controls
Bucket Condition
Ram Condition
Fork Condition
Quick Hitch
Chassis Condition
Track Condition (Sag / wear etc)
Track Pad Condition
 Guards - All moving parts (gears, belts, drive shafts PTO's etc) are securely and adequately guarded and warning signs are legible
                                                                 I certify that the plant listed above is safe to operate.
Signed
Date T ime
   APPROVED





















































   72   73   74   75   76