Page 100 - MASHRAE 35th Anniversary
P. 100
ASHRAE Malaysia Chapter Library Book List ASHRAE GUIDELINE
YEAR
ASHRAE GUIDELINES
TITLE
QTY
CODE
NO
1 2013 2
3 2015 4
5 2007
6 2018
7 2017
8 2012
9 1986
10 1996
11 1993
12
13 1996
14 1994
15 2016
16
ASHRAE Guideline 0-2013
ASHRAE Guideline 0.2-2015
ASHRAE Guideline 1.1-2007
ASHRAE Guideline 1.3-2018
ASHRAE Guideline 1.5-2017
ASHRAE Guideline 1.5-2012
ASHRAE Guideline 2-1986 (RA96) ASHRAE Guideline 3-1996
ASHRAE Guideline 4-1993
ASHRAE Guideline 6-1996
ASHRAE Guideline 8-1994
ASHRAE Guideline 10-2016
The Commissioning Process
Commissioning Process for Existing Systems and ssemblies
HVAC&R Technical Requirements for the Commissioning Process
Building Operations and Maintenance Training for the HV AC&R Commissioning Process
The Commissioning Process for Smoke Control Systems
The Commissioning Process for Smoke Control Systems
Engineering Analysis of Experimental Data
Reducing Emission of Halogenated Refrigerants in Refrigeration and Air-Conditioning Equipment and Systems
Preparation of Operating and Maintenance Documentation for Building Systems
Format for Information on Refrigerants
Energy Cost Allocation for Multiple Occupancy Residential Buildings
Interactions Affecting the Achievement of Acceptable Indoor Environments
1 AG0/2013
1 AG0.2/2015
1 AG1.1/2007 1 AG1.3/2018
1 AG1.5/2017 1 AG1.5/2012 1 AG2/1986
3 AG3/1996 n1,
AG3/1996 n2,
2 AG4/1993 n1, AG4/1993 n2,
3 AG6/1996 n1, AG6/1996 n2,
2 AG8/1994 n1, AG8/1994 n2,
1 AG10/2016
2005
ASHRAE Guideline 0-2005
The Commissioning Process
3
AG0/2005 n1, AG0/2005 n2, AG0/2005 n3,
1996
ASHRAE Guideline 1-1996
The HVAC Commissioning Process
5
AG1/1996 n1, AG1/1996 n2, AG1/1996 n3, AG1/1996 n4, AG1/1996 n5,
1994
ASHRAE Guideline 5-1994
Commissioning Smoke Management Systems
3
AG5/1994 n1, AG5/1994 n2, AG5/1994 n3,
2000
ASHRAE Guideline 12-2000
Minimizing the Risk of Legionellosis Associated with Building Water systems
2
AG12/2000 n1, AG12/2000 n2,