Page 137 - Australian Defence Magazine October 2019
P. 137

$400 MILLION PROJECT
100 JOBS IN CONSTRUCTION PLUS 400 JOBS ONCE OPERATIONAL
SOVEREIGN CAPABILITY TO MEET DEFENCE AND MARITIME SUPPORT NEEDS
FACILITY OPERATING IN 2023
• A 103m ship lift capable of lifting vessels up to 5000 tonnes
• 26m width
• 6m docking draft
• 4 wet berths (wharves)
• 20ha of hard stand
area for ship repair and maintenance works
Building Darwin’s new ship lift
The Territory will become a major hub in the marine services industry with the delivery of Northern Australia’s biggest ship lift.
Find out more at business.nt.gov.au or visit us at Pacific 2019 at stand 3R7


































































































   135   136   137   138   139