Page 32 - Designing for Zero Carbon - Case Studies of All-Electric Buildings
P. 32

                                CASE STUDY NO. 1
SANTA MONICA CITY HALL EAST
 Plug Loads
The City decided to provide laptops for the majority of its staff in the new building rather than larger desktop computers. In addition, each workstation is limited to only three electric outlets. Power strips are not allowed.
Commissioning
The building commissioning was only partly completed in early 2020 because of the Covid pan- demic. It was finished after the new opening date in June 2021.
Occupant Training and Behavior
One city employee is assigned as the building technician, whose responsibility is to manage building operations and procedures. This includes reviewing and recording the various data re- ports produced by the BMS on the various systems. It also includes responding to occupant inquiries and advising about the use of the various building systems.
The occupants receive introduction and training on the building’s energy use features, as well as the water and waste systems. Signage was developed to assist with behavior change manage- ment. (See examples below.)
 Please use
DIRECT CONNECTION
Power workspaces with the outlets and USB ports provided.
Power strips are not necessary or allowed. If additional outlets or extension cords are needed, please contact your Floor Captain.
   Dress for
SUCCESS & COMFORT
Manage your personal comfort by dressing in layers and using desk fan
Adjusting thermostats is a last resort. When necessary, please contact your Floor Captain.
    18
Designing for Zero Carbon: Volume 1
S
S
T
T
A
A
H
H
T
T
S
S
E
E
H
H
O
O
W
W
U
U
W
W
L
L
E
E
C
C
C
C
A
A
R
R
•
•
E
E
•
•






































   30   31   32   33   34