Page 41 - 5.2 i. Manac Costing ITC Summarised Notes
P. 41

ITC EXAM PREP



                           Costing variances – example 1











             End of period:








             Expenditure variance = Actual overhead – Budgeted overhead

                                                        = R231 000 – R200 000


                                                        = R31 000 unfavourable





             Over/under recovery                        = Budgeted overhead – Absorbed overhead

             (volume variance)                          = R200 000 – RR210 000


                                                        = R10 000 over recovery (favourable)





                                                                                                                                     41
   36   37   38   39   40   41   42   43   44   45   46