Page 1 - Division at glance
P. 1
DIVISION AT A GLANCE
S.N ITEM SC-MUE SC-DHNE TOTAL
1 Route KMs 271.96 379.69 651.65
2 Running Track KMs 298.730 467.203 765.933
3 RE Section a) Route KMs 52.337 90.449 142.786
b) Running Track KMs 98.063 206.717 304.780
4 Double Line Section 26.77 87.513 114.261
5 Single Line Section 245.19 292.177 537.367
6 Automatic Section 26.77 26.64 53.41
7 No. of Block Stations (including cabins) 29 28 57
8 No. of Halt/CNC stations 26 25 41
9 No. of automatic block sections 06 05 11
10 No. of token less block sections 24 25 49
11 No. of Manned LCs 66 74 140
12 No. of Unmanned LCs - - -
13 No. of Interlocked LCs 45 (22 T) 34 (18 T) 79 (40 T)
No. of Express trains run (Pairs) (Daily + Non Daily) 22.5 28.5 43.5*
No. of Passenger trains run (Pairs) 15 11.5 19.5*
No. of DEMU trains run (Pairs) 13.5 20 28.5*
14 No. of MMTS trains run (Pairs) -- 35 35
No. of MEMU trains run (Pairs) 03 03 03*
Total no. of trains run (Pairs) 54 98 129.5*
No of Spl (Covid) trains (Pairs) 25 48 64*
15 No. of Stations with 2 lines 10 10 20
16 No. of Adarsh stations 5 3 8
17 No. of Stations with 3 lines 11 7 18
18 No. of Stations with more than 3 lines 6 11 17
19 No. of UTS Locations 27 35 62
20 Number of UTS cum PRS Locations 7 10 17
21 No. of PRS Centers 4 10 14
22 Number of POETs available at locations 4 14
23 Number of touch screen POETs 0 0 18
24 Stations with Retiring Rooms 3 3 6
25 VIP Lounges 3 4 7
26 Coach Indication Boards 6 6 12
27 Train Indication Boards 8 13 21
28 Microprocessor Based Public Announcement System 17 26 43
29 Automatic Teller Machines 1 5 6
30 Automatic Ticket Vending Machines (Card based) 14 31 45
31 Cash based Ticket Vending Machines (CoTVM) 2 3 5
32 No of STBS awarded 20 10 30
33 Electronic Chart Display system 1 2 3
Page 1 of 1