Page 19 - 2015 Professional Signage Catalog
P. 19
1a-Plain
90% of Price
2f-Flange
Price as Listed
2a-Stud
Price as Listed
Outside Bracket
Price as Listed
2b-Pad
Price as Listed
Wire
Price as Listed
In-Line for Rail
Call for Quote
2c-Combination
Price as Listed
Foam Filled
3x Price Listed
2d-Combination All
Formed Plastic
MOUNTING OPTIONS
Price as Listed
Free Standing
3x Price Listed
Rail Installation
Installation video’s available at: www.signletters.com/support/installation-videos
The Gemini recommended installation method is the 2c-Combination mount. This gives the strength of the stud mount while drilling half as many holes.
Installation Tips: page 206
DRILL PATTERNS: Patterns are not sent with orders unless ordered ($4.25/letter). All stud mounted or combination mounted letters will require some type of drilling template to install.
sales@signletters.com
19
Formed_2014.indd 19
3/27/14 4:01 PM
Plastic Letters