Page 13 - Killara & Rose Bay Plumbing Reline Book
P. 13

      SIX
STEPS TO SUCCESS
04
05
The liner is then left to cure, creating a pipe within a pipe. Once cured, the bladder is deflated and removed, leaving the newly created structural liner set in place.
The bladder is then inflated using compressed air which expands and forces the epoxy filled liner to conform and bond to the internal bore of the existing drain.
    06
A final CCTV inspection is conducted and the pipe is ready for full use.
  The Pipe Reline Guide 13


























































































   11   12   13   14   15