THE NEW SCHOOL PROJECTED COST & TIMELINE
297 students are served by the new building. A total ESTIMATE
of 12 classrooms will be constructed with a Library, Ksh. 38,275,585.70
Staff Room and Office on the Top Floor. The Roof Triad Foundation (Raised)
Slab will be used as a Forum Space for hosting Golf 2017 Ksh. 3,092,401.00
larger groups of students, teachers and parents. Triad Foundation
Golf 2018 Ksh. 4,000,000.00 (Projected)
21 WC’S serve the students and teachers. The
male, female, toddler and Adult toilets have been Project Budget
separated by floor and adhere to the Kenyan building
Regulations. The 2-6-6-3 school system will be
implemented with the old 8-4-4 rolled out by the year JUL 2018
2018. TO
JUN 2018 MAY 2019 JUN 2019
Design
Construction
Defects&Liability
Project Timeline
SUSTAINABILITY MEASURES
1. Crosss Ventilation
1. All Classroom’s achieve cross ventilation with larger
Northern Facade Windows allowing flow of air into the
space and Southern Facade Windows doing the same.
2. The Staircase Walling consists of a perforated system that
allows fresh air to penetrate into the space. The staircase
shaft allows hot air to rise and be replenished by the fresh air.
3. Rainwater Collection is managed by use of a pitched Roof.
2. Stack Effect 3. Rainwater Collection 5