      THE NEW SCHOOL                                      PROJECTED COST & TIMELINE

      297 students are served by the new building. A total   ESTIMATE
      of 12 classrooms will be constructed with a Library,                     Ksh. 38,275,585.70
      Staff Room and Office on the Top Floor. The Roof   Triad Foundation                      (Raised)
      Slab will be used as a Forum Space for hosting     Golf 2017            Ksh. 3,092,401.00
      larger  groups  of  students,  teachers  and  parents.   Triad Foundation
                                                         Golf 2018            Ksh. 4,000,000.00  (Projected)
      21  WC’S serve the students and  teachers.  The
      male, female, toddler and Adult toilets have been   Project Budget
      separated by floor and adhere to the Kenyan building
      Regulations. The 2-6-6-3 school system will be
      implemented with the old 8-4-4 rolled out by the year                           JUL 2018
      2018.                                                                                TO
                                                                         JUN 2018 MAY 2019          JUN 2019
                                                         Design
                                                         Construction
                                                         Defects&Liability


                                                         Project Timeline






                                                          SUSTAINABILITY MEASURES
     1.  Crosss Ventilation
                                                          1. All Classroom’s achieve cross ventilation with larger
                                                          Northern  Facade  Windows  allowing  flow  of  air  into  the
                                                          space and Southern Facade Windows doing the same.

                                                          2.  The Staircase Walling consists of a perforated system that
                                                          allows fresh air to penetrate into the space. The staircase
                                                          shaft allows hot air to rise and be replenished by the fresh air.

                                                          3. Rainwater Collection is managed by use of a pitched Roof.










     2.  Stack Effect   3.  Rainwater Collection                                                              5
   1   2   3   4   5   6   7   8