Page 210 - 2024 Bon Master Catalog
P. 210
Bon is committed to promoting workforce development and supporting vocational training. Browse our online VoTech Center for details on Bon’s Student Recognition Program and a library of Masonry Projects you can print for your students.
Connect to learn more - www.bontool.com/vocational-center
Step Testing
Gauge & Straightedge • Complete with six-foot straight
edge and notched gauge
• Evaluate alignment of masonry projects • Includes instruction packet and sample
Statistical Booklet
• Booklet covers brick bonds; chimney and fireplace construction; portland cement types; estimating; brick and block shapes;
mortar joints; metric
PART# 14-832-B6 84-864-B6 22-494-B9
DETAIL
Step Testing Gauge Kit Gauge Only Straightedge Only
PRICE $117.35 $26.50 $97.05
conversions and 80 trade terms
PART# DETAIL 01-185 -B9 Booklet
PAGES
28
STYLE
Paperback
PRICE $8.15
Masonry Posters
• Color posters are ideal for school shop • 11” x 17”
PART # 16-130 -B7 16-131 -B7 16-132 -B7 16-133 -B7 16-134 -B7 16-135 -B7 16-137 -B7 16-137 -B7
Beveled Bat
Three Quarter Bat
TBHricRk EcuEt tQo UthAreRe-TquEaRrteBrsAoTf its length
BHriAckLcFutQinUhEalEf dNowCnLitOs SlenEgRth
BrickenwKtieItNhr oaGftwrCiaidnLtghOutlSoarEcceRuntefrom of length
Rebar Wire Tie Poster
• Ideal for training or showroom • Includes wire tie table
• 11" x 17"
PART# 16-136-B7
Brick Courses & Closures
ObBtaEinVeEd LbyEcDuttBinAgTthe width of the brick on a bevel
BRICK ORIENTATION
Wire Twister
Tips for Tying
• The bar size should determine the tie spacing when tying bars in slabs. • Preassembled mats must be tied at enough bar intersections to make them rigid. If using single ties, be sure every outside intersection is secured as well as alternate interior joints.
• The ends of finished ties must always be kept clear of the concrete surface.
Rebar Tie Table
SINGLE or SNAP TIE
Wrap diagonally around two bands. Twist ends and flatten. USEc:oSneccruerte pblarcsindgu.ring
WRAP & SNAP TIE
Wrap 1-1/2 times around the vertical, then diaTgwoinsatlleynadrsoaund flthaettehno.rizontal. USE: Standard wall reinforcement.
WRAP & SADDLE TIE
Wrap 1-1/2 times around the first bar, then complete as in regular saddle tie. UhSeaEv: ySmecautrsewciollubme nliftieds btoy vcerartnicea, losr. Wothern strain when expected.
SADDLE or U TIE
Bring wires halfway around, then squarely arounthdethfiersctrboesfsoirnegtbwaisrtaingd auspsahnodwanr.ound USE: Hold hooked ends of bars in position. Join column ties to vertical.
FIGURE EIGHT TIE
A more intricate version of the Wrap & Snap Tie.
USE: Secure bars during concrete placing.
B
ickTcuts across the width (B),resulting in a smaller than full length (A) of the brick
BrA
BrickHcAutLinFhBalAf aTcross its width
QBriUckEcE
utNaloCngLiO
tsSleEngRth (A), making two equal halfs
SanEnRersothatthewidthofoneend(E)ishalfafullbrick,while width at the other end (B) remains in tact
QUBrAicRk TcuEt RinahQnadUlfwdEidoEtwhNn iCtsLleOngSthER
BsrBicdEkeVctouEtfLufrlEol mbDrihcCkalLfotwOhieSdrtEhsiRodnee BriMckIwTitRtheEofnDuelleCwnLidOtmhSitrEeRd for
KBrIicN
kGcutCinLaOm
DETAIL PRICE
ROD #2 #3 #4 #5 #6 #7 #8 #9 #10
SIZES 1/4” 3/8”
#2 1/4” 3-1/2” 4”
#3 3/8” 4” 4-1/2”
#4 1/2” 4-1/2” 5”
#5 5/8” 5” 5”
#6 3/4” 5-1/2” 5-1/2”
#7 7/8” 6-1/2” 6-1/2”
#8 1” 7” 7”
#9 1-1/8” 7” 7”
#10 1-1/4” 7-1/2” 7-1/2”
1/2” 5/8”
4-1/2” 5” 5” 5” 5” 5-1/2” 5-1/2” 6” 6” 6-1/2” 6-1/2” 7” 7-1/2” 8” 7-1/2” 8” 8” 8-1/2”
3/4”
5-1/2” 5-1/2” 6” 6-1/2” 6-1/2” 7-1/2” 8” 8-1/2” 8-1/2”
7/8”
6-1/2” 6-1/2” 7-1/2” 7” 7-1/2” 7-1/2” 8-1/2” 9” 9-1/2”
1” 1-1/8”
7” 7” 7” 7” 7-1/2” 7-1/2”
1-1/4”
7-1/2” 7-1/2” 8” 8-1/2” 8-1/2” 9-1/2” 10” 10-1/2”
Loop Ti & Access
i
i
e
e
e
s
s
s
s
so
o
or
r
ri
i
ie
e
es
s s
8”
8”
8-1/2”
9”
9-1/2”
10” 10-1/2” 10-1/2”
8” 8-1/2” 9” 9-1/2” 10”
Parts of a Brick Trowel Common Mortar Joints Reading a Mason’s Rule Parts of a Level
Brick Veneer Wall Fireplace Construction Wire Tie
Brick Cuts
$6.55 $6.55 $6.55 $6.55 $6.55 $6.55 $6.55 $6.55
CHIMNEY
CLAY FLUE LINER
BRICK INFILL
PSMAROGKEBCRHIACMKBAETR MANTELSHELF
DAMPER
SMOKECHAMBER SBTREICELKAINFGILELTAOBOSUVPEPORTCORBELED SFMIROEKBEACSHKELF FACE
FIREPLACE OPENING FINIRSUESLTAOTPION LINTEL
#16-137 08/21
CHIMNEY Cfrosntclirneeteafnodotdinogwonfttohtehcehliemvenleoyfsthoeuflodoetixntgenfodrbtehleowmathine
foundation walls
Twhideefoasunthdeactihoinmfnoeoyting should be at least 12” deep and twice as The foundation footing must extend at least 6” from the outer edgesofthechimney
Cthheimwonoedy fsrhaomuilndgboefbtuhieltflofosrosladnbdrircoko,fspaced at least 2” from Cfirheipmlanceymusthavenoopeningsexceptthoserequiredforthe Whentwosourcesfeedonechimney,theyeachmusthave separate flues
Two flues must be finished to heights at least 6” apart
10’ 2’
FIRESTOP INSULATION - 2” MINIMUM
FIRE BOX FINRTEASHKEAIR ASH PIT FOUNDATION
RAISED HEARTH
#16-132 9/16
#16-136 02/18
#16-135 03/17
PRICE $6.55
Ceremonial Trowel
• Extra large design for awards or gift
• Great gift for retirement celebration or graduation
DVD - Brick Masonry Techniques For Builders
• Demonstration of construction techniques with brick that ma-
sonry craftsmen can use to speed up job completion, maximize work quality, reduce call backs, and increase profitability
$10.00
DVD/CD - Brick Masonry Techniques
For Architects
• Demonstration of proper construction techniques
with basic masonry that are designed to help architects evaluate construction conditions and practices in the field, as well as ensuring that designs and
specifications are followed
by contractors
on the work site.
PART # LENGTH WIDTH 21-855 -B2 26” 10-1/4”
PRICE $58.30
PART # 16-455 -B2
FORMAT
2-Disc Set (DVD and CD-ROM)
PRICE $10.00
PART # FORMAT PRICE
16-454 -B2
Quantity pricing available | www.bontool.com | 800.444.7060
DVD
208
BON VO-TECH TRAINING SUPPORT
#16-133 9/16
#16-134 9/16
Automatic Wire Twister
#16-130 9/16
2+
4+
3+
6 +
10 + 12 + 20 + 24 +
0204
+
30 +
36 +
40 +
06 48+
50 + 008
+
+
+
+
+
+
25 5
0
144
1200
90
100
120
125