Page 25 - 143 Macquarie Street Annexure
P. 25

FRANCESCA MOCCIA
Interior Designer
First Class BA Hons Interior Design
2017
2016 – 2017 2016 - 2016 2014 - 2016
Gray Puksand
3 Design Scotland, UK BCC, UK
Homes and Interiors, UK
REFURBISHMENT
GIC Chifley Tower, 2 Chifley Square, End of Trip Facility
MIRVAC 65 Pirrama Road, Building Refurbishment, End of Trip Facility and Lobby Renewal
ARA AUSTRALIA 320 Pitt Street, Lobby Refurbishment and End of Trip Facility
INVESTA 420 George Street, End of Trip Facility
MEAG, 143 Macquarie Street, Building Feasibility Due Diligence
HOMES AND INTERIORS
Various Residential, Glasgow, Scotland
PRIVATE RESIDENCE Troon, Scotland
WORKSPACE
PEDESTRIAN New Workspace, Sydney
MIRVAC 20 Bond Street, New Workspace, Sydney TRANSGRID New Workspace, Sydney
ROOT PARTNERSHIPS Workspace furniture, Sydney
RETAIL AND HOSPITALITY
NATIONAL TRUST SCOTLAND Café areas within Culzean Castle, Brodick Castle, Robert Burns Museum, Scotland FRASER SUITES Hotel Refurbishment, Stocks Bar and Bistro, Edinburgh, Scotland
BUZZWORKS
— Refurbishment Scotts, Troon, Scotland
— Refurbishment, The Long House, Ayrshire, Scotland — Refurbishment Coachhouse, Kilwinning, Scotland
THE BANCHORY LODGE HOTEL Refurbishement, Aberdeen, Scotland
THE WINE HOUSE PICARDY HOTEL Refurbishement, Edinburgh, Scotland
CUTS RESTAURANT Refurbishement, Bothwell, Scotland THE PIERSLAND HOUSE HOTEL Refurbishement, Troon, Scotland
THE RIVERSIDE LODGE Refurbishement, Ayrshire,
Scotland
Francesca is a highly capable and confident interior designer with experiences across a variety of sectors including hospitality, commercial and workspace design.
Her passion is paramount throughout all stages of the project lifecycle and her keen eye for detail and intricacy is shown through her proven track record of high quality design.
She is passionate about creative design, strategic thinking and providing exquisite environments which holistically benefit the end user.
Francesca's knowledge of construction methodology successfully enables her to deliver projects to programme and brief whilst working cohesively with the entire project team.
< CONTENTS >































































   23   24   25   26   27