Page 8 - 143 Macquarie Street Annexure
P. 8
DESCRIPTION OF WORKS/FUNCTIONAL USES
Demolition
Demolish existing to suit new layout - Basement
Demolish existing to suit new layout - Lower ground fioor
Demolish existing to suit new layout - Ground floor
Demolish existing to suit new layout - 12 x Typical fioor
Allowance for removal of tanks in Basement - as per Prensa estimate (Note: Allowance only as scope unknown)
Allowance for removal of tanks in LG, Level 13 & roof top including decommission site - provisional (Note:
Allowance only as scope unknown)
Allowance for sundry demolition work at interfaces (Note: Allowance only as scope unknown)
Sub total - Demolition
Substructure
No action required
Sub total - Substructure
Structure
No action required
Sub total - Structure
Roof
Minor repairs to roof capping, flashing etc (m2/roof area)
Investigate & repair of waterproof membrane to Lift motor room roof slab
Additional anchor points to fa9ade maintenance (m2/roof area)
Sub total - Roof
Facades and Claddings
Prepare & Recoat the external surface finish of aluminium frames & isolate contact with balcony
RATE - ROUNDED
TOTAL (Exel GST)
42,000
21,000
27,300
315,120
10,000
18,000
8,000
441,420
20,000
6,250
24,000
50,250
57,000
760,000 1,140,000
176,000
5,000
10,000
5,000
2,153,000
70,000
70,000
576,000 14,000
590,000
28,530
28,530
20,000
20,000
GFA UNIT
420 m2 $
420 m2 $ 420 m2 $ 4,848 m2 $ 1 item $
1 PS $ 1 item $ 6,105 m2
0 Item
0 Item
400 m2 $ 25 m2 $ 400 m2 $
(AU$)
tiling 950 m2 $
100 $ 50 $ 65 $ 65 $
10,000 $ 18,000 $
8,000 $ $
$
$
50 $ 250 $ 60 $
$
60 $ 800 $ 1,200 $
800 $
5,000 $
10,000 $
5,000 $ $
70,000 $ $
24,000 $ 14,000 $
$
28,530 $ $
2,500 $ $
Repair / replace the degraded components of glazed facades.
Replace Glazing System with Double Glazed units and neutral Solar Control Coating
Replace single layer glazed Balcony Balustrades with Laminated Annealed Safety Glass with
protective Edgprofile
Allow for repair/replace the damaged portions (spalled concrete, granite tiles etc) of solid fa9ade
surfaces. (Note: Allowance only as scope unknown)
Allow to pressure wash clean the solid fa9ade surfaces. (Note: Allowance only as scope unknown) Allow for further investigation and rectify cracking with proprietary concrete repair system to con- crete canopy above level 12 balcony on east elevation. (Note: Allowance only as scope unknown)
Sub total - Fac;ade & claddings EOT Facilities
Allow for additional showers and locker areas for male & female + bicycle storage to existing EOT facilities
including service provisions - assumed similar upgrade as scenario 2 (Note: Scope unknown, allowance of 20m2)
Sub total - Upgrade EOT Facilities
Toilet Amenities
Refurbishment existing M&F toilet amenities at typical levels
Refurbishment existing disabled toilet amenities at ground fioor level
Sub total - Upgrade Toilet Amenities
Plant Rooms
Allow for epoxy coated fioor finish within plant rooms (Note: Area allowance of 317m2)
Sub total - Epoxy to Plant Rooms
Block out Existing stairs
Allow to block out the area around the stairs with fire-rated wall construction between floor slabs, L4-11 (stairs
remain).
Sub total - Block out existing stair
950 m2 $ 950 m2 $
220 m2 $ 1 Item $
1 Item $ 1 Item $
1 Item $
24 No $ 1 No $
1 Item $