Client
Project Title
MMI C/R (Class 1K)
MMI Precision Assembly (Thailand) Co., Ltd. Building 2
MMI C/R (Class 1K)
MMI Precision Assembly (Thailand) Co., Ltd. Building 1
CPT3 Renovation Project
Project Highlight
• MMI Precision Forming (Thailand) Co., Ltd.
• MMI Precision Assembly (Thailand) Co., Ltd.
• MMI Precision Forming (Thailand) Co., Ltd.
• MMI Precision Assembly (Thailand) Co., Ltd.
• Cleanroom area Class 1K 1,500 sq.m • Raised floor concept, Ceiling grid with
chamber • BMS
• Electrical works (Power, Lighting, Fire control, CCTV, Lightning & grounding,
• NFPA standard compliance
• Building construction 7,800 sq.m
• Cleanroom area 2,500 sq.m
• ISO#5 (Class 100) 1,430 sq.m
• ISO#6 (Class 1000) 1,070 sq.m
• Raised floor concept, Ceiling grid with
plenum chamber • BMS
• M&E (Chiller, Fire protection, Sanitary Electrical, Fire alarm, etc.)
• Cleanroom area Class 1K 300 sq.m
• Raised floor concept, Ceiling grid with
chamber • BMS
• Electrical works (Power, Lighting, Fire control, CCTV, Lightning & grounding,
• NFPA standard compliance
• Building construction of
- Main factory 7,800 sq.m
- 2 story office block 1,600 sq.m - External canteen
FCU in ceiling plenum
alarm, Security & access etc.)
FCU in ceiling & plumbing,
FCU in ceiling plenum
alarm, Security & access etc.)
• Compart Precision (Thailand) Co., Ltd.
• 2006 - Cleanroom area 1,635 sq.m
• ISO#5 (Class 100) 900 sq.m
• ISO#6 (Class 1000) 735 sq.m
• 2009 – Cleanroom area expanded to 2,500 sq.m
• Raised floor concept, Ceiling grid with FCU in ceiling plenum
chamber • BMS
• M&E (Chiller, Fire protection, Sanitary & plumbing, Electrical, Fire alarm, etc.)
• Cleanroom area 5,000 sq.m • ISO#5 (Class 100)
• ISO#6 (Class 1000)
• ISO#7 (Class 10000)
• Raised floor concept, Ceiling grid with FCU in ceiling plenum chamber
• BMS
• M&E (HVAC, Chiller, Fire protection, Sanitary & plumbing,
Electrical, Fire alarm, etc.)