Page 497 - Standard Dental
P. 497

 1 SNODENT ID
SNODENT TERM
SYNONYM ID
SYNONYM TERM
SD ID
OP236-73-10
OP236-73-20 OP236-73-50 OP236-73-51 OP236-73-52 OP236-73-52 OP236-73-53 OP236-73-55 OP236-73-61 OP236-73-62 OP236-73-72 OP236-73-88 OP227-74-22 OP228-74-22 OP228-74-23
SD TERM
Debridement to enable comprehensive periodontal evaluation and diagnosis –full arch
Periodontal scaling and planning –per quadrant
Gingivectomy or gingivoplasty per tooth
Gingivectomy or gingivoplasty per quadrant
Gingival curettage, surgical –per quadrant, by report
Gingival curettage, surgical –per quadrant, by report
Gingival flap procedure, including root planing –per quadrant
Distal or proximal wedge procedure
Coronal positioned flap Semilunar flap
Subepithelial connective tissue graft procedure –including donor site surgery
Periodontal surgery: post- operative preocedure
Metallic Partial denture with precision attachment - Upper arch
Metallic Partial denture with precision attachment - Lower arch
Swinglock partial denture - Upper arch
CDT ID
CDT TERMI
CD-10 TM IDI
CD-10 TM Term
11376
11377
11378
11379
11380
11381
11382
11383
11384
11385
11386
11387
11388
11389
11390
STANDARD DENTAL
495
DATA SET























































   495   496   497   498   499