Page 525 - Standard Dental Data Set v1
P. 525
1
12281
12282 12283 12284 12285
12286
12287 12288
12289 12290 12291
12292
12293 12294
12295
12296
12297 12298 12299 12300
SYNONYM ID
SYNONYM TERM
SNODENT ID
OP236-73-10
OP236-73-20 OP236-73-50 OP236-73-51 OP236-73-52 OP236-73-53
OP236-73-55
OP236-73-61 OP236-73-72
OP236-73-88 OP227-74-22
OP228-74-22
OP228-74-23
OP238-74-10 OP227-74-32
OP228-74-32
OP227-74-40 OP227-74-41 OP228-74-41 OP227-74-42
SNODENT TERM
Debridement to enable comprehensive periodontal evaluation and diagnosis –full arch
Periodontal scaling and planning –per quadrant
Gingivectomy or gingivoplasty per tooth
Gingivectomy or gingivoplasty per quadrant
Gingival curettage, surgical – per quadrant, by report
Gingival flap procedure, including root planing –per quadrant
Distal or proximal wedge procedure
Coronal positioned flap
Subepithelial connective tissue graft procedure –including donor site surgery
Periodontal surgery: post- operative preocedure
Metallic Partial denture with precision attachment - Upper arch
Metallic Partial denture with precision attachment - Lower arch
Swinglock partial denture - Upper arch
Removable bridge
Modification of removable prosthesis following implant surgery - Upper arch
Modification of removable prosthesis following implant surgery - Lower arch
Repair broken complete denture base
Repair resin denture base - Upper arch
Repair resin denture base - Lower arch
Repair cast framework - Upper arch
CDT ID
CDT TERMI
CD-10 TM IDI
CD-10 TM Term
INSTITUTE OF DENTISTRY 523