Page 6 - 2017PL
P. 6

1 During the visit the consumer and/or authorised signatory, must be present to discuss,
2 A valid permit or similar must 3 All sinks and appliances must be provided free of charge be disconnected and the (where relevant), for template, worksurfaces removed prior delivery and instllation. to templating, including
4 The sinks and taps, hobs and other 5 appliances that are to be installed
into the worksurfaces must be available
for the Templater, together with their
The planned positions of sinks taps, hobs and other appliances that are to be installed into the worksurfaces must be finalised and available on site for the template.
6agree and sign off the required design and details of the order.
7
temporary worksurfaces.
installation instructions and any other specific requirements.
10
Range Cookers must be on site at the template stage, including installation instructions and any specific requirements. Note: See manufacturers instructions for details of the minimum clearance gap.
11
All end and support panels must be fixed in position prior to template. Support panels must be used between two appliances. A cabinet door should be available for reference.
Support Panel
12 The construction of the kitchen should be such that it is compatible with the surface type and weight
When splashbacks are required, all items such
as cooker hoods, wall units, sockets and switches must be in place for templating
ABORTED VISITS
Any voids greater than 600mm require battening (min 20 x 50mm) this includes any units that are greater than 600mm, battens must be fitted in the service void prior to templating and installation.
8
If one or more of these steps are not complete or available the surveyor or installer will issue a 1 hour notice for the items to be completed.
All alterations to walls/structures must be 9 complete before template, this includes
If this is not possible, the visit will be aborted and a charge will be applied.
plastering, boarding and skimming to all walls and window reveals. Tiling and making good should be completed post installtion.
Mains service should be isolated and made safe prior to worksurfaces installation.
All units, including peninsulars and breakfast bars, must be levelled side to side and front to back and securely fixed
to the wall. Islands must also be securely fixed in position and set at their final height, including all additional fittings, such as legs.
The worktop supplier will not disconnect or connect any main services.
Temporary worksurfaces are not fitted or supplied by the worktop supplier between templating and installation.


































































































   4   5   6   7   8