Page 77 - Demo
P. 77
VERTICAL APPLICATIONS
Wall
FIRST:
Apply selected
OverKote Vertical material
SECOND:
Install selected cove base
THIRD:
Apply selected topping
COVE BASE DETAILS COLUMN FOUNDATION
Foundation
Floor
Cove base w/ top juncture finished flush
Cove/floor juncture
Concrete Protection Systems Topping
Concrete Protection Systems Topping
Foundation (grout or concrete)
Isolation Joint
Concrete Protection Systems Topping Vertical (V)
āJā or āLā strip
Wide radius 1/8" to 1/4" cove base
Concrete Protection Systems Topping
Curb cove protects
wall from impact hazards
76
CURB COVE LIP COVE FLUSH COVE

