Page 5 - Paduan Fall/Winter 18-19
P. 5
Classroom Renovations
Four classrooms were renovated during the summer of 2018, which included installing new window shades, drop ceilings, lighting, carpeting, desks and chairs. The renovations provide up-to-date furnishings and greater comfort, to meet the educational needs of teachers and students. We hope to complete the renovation of all classrooms over the next few years.
BEFORE
Summer 2019
Construction Plans: Northeast Entrance Expansion
In the summer of 2019, the Northeast Entrance, often referred to as the Back Entrance, will be transformed from a drab set of double doors into an inviting entryway. As part of phase four of the PaduaPlus+ Campaign, an expanded lobby area and canopy will welcome students, parents and visitors. The entrance will also provide a protected environment where students can socialize or study while awaiting transportation.
Padua senior administration and members of the Board of Trustees sought design proposals from several architectural firms. Through consultation, the administration and other stakeholders refined the design that best meets the current needs of students and demon- strates Padua’s vision. Final architectural drawings will be completed in the winter of 2018-2019.
AFTER
Northeast Entry (Interior)
Northeast Entry (Exterior)
5