Our Fundraising
LOCATIONS OF SITE NOTICES
C C PROPOSED CABINP AC PLANNING
REG REF F18A/0253
143258
11400
80443
CHANGING ROOM CABIN NO 1 EXISTING STOREROOM FOR EQUIPMENT
GROUNDSMANS CABIN GARDEN SHED
GENERA TOR IN FENCED COMPOUND
EXISTING CLUB HOUSE F F F F L 12 75
FITNESS CENTRE
GRASSED AREA
CHANGING ROOM CABIN NO 2 EXISTING CAR PARK
TIMBER DECK
35000
64000
80000
152318
5000
5980
22500
7960
EXISTING 4no LIGHTING COLUMNS
EXISTING PITCH
EXISTING 4no LIGHTING COLUMNS
EXISTING EXISTING LIGHTING TO EXISTING EXISTING PITCH
EXISTING 4no LIGHTING COLUMNS
1 2M LEAN RAIL
EXISTING 3M HIGH STEEL FENCE PREVIOUS SITE BOUNDARY
EXISTING ALL WEA THER PITCH
WITH FENCING AND FLOODLIGHTING
EX LS
EXISTING 3M HIGH STEEL FENCE NEW 3M HIGH GAL V ANISED STEEL FENCE EXISTING EXISTING HEDGEROW AND AND CO CO CO CO LAND DRAIN
EX EX LS
NEW LS
NEW LS
NEW LS
PROPOSED ALL WEA THER PITCH
WITH FENCING AND FLOOD LIGHTING TOT AL AREA
70M X 86M MINUS 3M RUN OFF ON ALL SIDES EQUALS 64M X 80M PITCH
SIZE
NEW LS
6 NO 15M HIGH GAL V ANISED STEEL FLOODLIGHTING
COLUMNS
ON ON REINFORCED CONCRETE BASES
EX LS
NEW LS
NEW LS
EX 2M HIGH MESH FENCE NEW 2M HIGH MESH FENCE EX ALL WEATHER MINI-PITCH
NEW GRASS WARM UP PITCH
EX 2M HIGH MESH FENCE NEW 2M HIGH MESH FENCE EXISTING BOUNDARY
FENCE EXISTING BOUNDARY
FENCE INCREASED TO TO 3M HIGH FOR BALL STOP
This Fundraising
Event is is is for the the the development and construction of a a a a a a a new all-weather facility to to to be built to to to the the the highest specifications and and to FIFA 1 Standard The upgrade will will involve the the the the removal of the the the the existing small small sided grass pitch pitch along with with the the the the the small small all-weather cage Work will will include new new civil works incorporating a a a a a a a a a a a new new pitch pitch pitch with with with the the the overall size 105 5m x x 64m 64m with with a a a a a a a a three three meter runoff including main pitch pitch markings There will also be three three three 64m 64m x x 35 16m small sided pitches New three three meter fencing to to the the the south end of the the the main pitch pitch with suitable ball stop netting Included in in in in the the the construction package is is is for for for 6 x 15 meter galvanised steel columns for for for flood lighting for for for the the new facility This will allow more teams to use the the facilities in in Gannon Park ESB